21 Job openings found

1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should have experience in Solar Tracker Sungrow inverter Solar O&M gound mounted experience should be 10 yrs We need stability no frequent change Unit SOLAR ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should have experience in Solar Tracker Sungrow inverter Solar O&M gound mounted experience should be 10 yrs We need stability no frequent change Unit SOLAR ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 17.00 LPA
O AND M Site Incharge Wind  1) Job Purpose: Write the purpose for which the job exists  The Wind Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset Management ofthe wind power plant. This role ensures regulatory compliance and smooth ...
2 Opening(s)
13.0 Year(s) To 16.0 Year(s)
20.00 LPA TO 20.00 LPA
Business Solar business  1) Job Purpose: Write the purpose for which the job exists  The Solar Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset Management ofthe Solar power plant. This role ensures regulatory compliance and smooth coordination with ...
4 Opening(s)
4.0 Year(s) To 7.0 Year(s)
12.00 LPA TO 12.00 LPA
Business Solar & Wind power business Unit Wind (O AND M) Location - Bhuj and Fatehgarh O AND M Site Incharge Wind  1) Job Purpose: Write the purpose for which the job exists  The Wind Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset ...
2 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
It is a fixed tilt plant with 104 MW. Location is Jadi, GJ and Dhanera is the nearby city (15 kms away)able to handle local issues properly He should have experience of handling atleast 70 MW independently Should have Solar Ground Mounted Exposure of min 10 Years through out. Should ...
2 Opening(s)
8.0 Year(s) To 8.0 Year(s)
18.00 LPA TO 18.00 LPA
Business Solar & Wind power business Unit Wind (O AND M) Location - Bhuj and Fatehgarh O AND M Site Incharge Wind  1) Job Purpose: Write the purpose for which the job exists  The Wind Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
55.00 LPA TO 55.00 LPA
Managing the process of obtaining grid connectivity for renewable energy projects. This includes coordinating with various stakeholders, navigating regulatory frameworks, and ensuring compliance with technical specifications. The role requires a strong understanding of transmission infrastructure, renewable energy technologies, and project management principles.    Here's a more detailed breakdown of the job description: Key Responsibilities: Connectivity Application ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
50.00 LPA TO 55.00 LPA
Experience: 15+ years in EHV Substation & Transmission Lines-  EHV Line CTU/ STU permission and approvals, compliance and regulatory management within the renewable energy sector Mandatory areas of Domain Expertise. Substation Engg. (AIS/GIS) 400kV, 220kV, 132kV, 66kV, 33kVa. In-depth knowledge of design and detailing of EHV system for Renewables Projects. (Solar PV/ Wind/ EHV Substation).b. Preliminary design, ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile