Sr FITTER-ROLLING MILL

Sr FITTER-ROLLING MILL

4 Nos.
21010
Full Time
5.0 Year(s) To 7.0 Year(s)
1.80 LPA TO 2.00 LPA
Production / Quality / Maintenance
Steel/Metal/Iron/Non-ferrous
ITI - Fitter
Job Description:

Urgent requirement of  Fitter for ROLLING MILL DIVISION for a reputed Steel Industry at Rourkela, candidate Should be able to design tools and should be result oriented with time limit.o Minimum 5 years of Industry experience in placing and aligning the machines at certain level as per industry standards.Roll assembly fitter

Company Profile

Built up as a little privately-owned company, today the association has developed manifolds with raids into Sponge Iron assembling, Power Generation, Steel Trading and Real Estate Development. an unassuming starting path back in the mid-twentieth century, exchanging principally in Textiles. Having tasted achievement in materials, expansion unavoidably occurred, and contracting business for common works was taken up for the sake of Construction Company It got one of the most adaptable and presumed contractual workers of the locale having executed huge undertakings for Larsen and Toubro, Tata gathering, and so forth. The business was additionally broadened into Rolling-Mill, Mechanized Bricks producing, and Steel Trading which were worked effectively. Assuming control over the organization of Hindustan Lever was simply one more case of enhancement.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

CCM SENIOR FITTER - SMS
FITTER,B.TECH/B.E.
SHIFT INCHARGE MECHANICAL - SMS
SHIFT INCHARGE,MECHANICAL
MINING FOREMAN
MINING SERVEYOR ,DATA MINING,MINING SEARCHING
MANAGER MAINTENANCE - AUTOMOBILE
AUTOMOBILE MAINTENANCE,AUTOMOBILE MAINTENANCE ENGINEER