Solar Project Manager

Solar Project Manager

1 Nos.
86135
Full Time
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.50 LPA
Site Engg/Service/Project Mgt/After sales
Power/Energy - Solar/Wind/Hydro/Nuclear
B.Tech/B.E. - Electrical
Job Description:

Roles & Responsibilities :

Set up the SOP for site survey and design. Supervise the work of the design engineer for accuracy, and optimization of design as per site survey conducted.

Ensure BoM is designed to maximize cost-benefit to achieve while keeping losses at a minimum.

Conduct site surveys before plant design and layout are finalized.

Should be updated with the latest technologies in panels, inverters, structures, racking techniques, installation techniques, etc.

Liaison with the Business Development Team to understand the client's requirements to ensure plant design & engineering is pre-approved and incorporated in the PPA.

DC & AC side designing which includes design & selection, calculating the rating of the switchgear and protection required in the system, cable sizing, earthing calculations, etc.

Analyzing the existing system configuration and selecting a proper evacuation .

DC side designing of solar rooftop PV projects, which include the stringing calculations, module selection, inverter range, etc.

Shadow analysis PVsyst report for estimating the yield generation of the solar plant Fluent in PV Syst, Helioscope, SketchUp and AutoCAD,

Solar lab Execution:- Should have executed a minimum of 20 C&I/ utility projects across tin/ RCC roofs as well as ground-mounted projects. (At least 1 project should be 1 MW+) Inspecting field sites to observe, evaluate condition, the operability of facilities and structures and collect field survey data, and measurements.

Check drawings, specifications, and BOQ for allotted work; And report any deviations.

Knowledge of state-of-art technical skills in materials & methods in the construction of large projects. Prepare defects/ snag list and provide instructions for rectification.

Collection of data, analysis, and design of structures. Material testing, foundation testing. Prepare daily, weekly & monthly reports as required by supervision and management teams.

Formulate project baseline, monitoring, controlling, resource deployment, quality compliance & ensure satisfactory execution of projects.

Guide project management, scheduling, planning, erection, and commissioning of the project within stipulated timelines. Managing contractors and vendors.

Ensuring safety is given the highest priority during the installation and execution of the project.

Behavioral strengths:- Willing to travel extensively experience in designing and project management Detailed attention must be given to adherence to MNRE standards and health and safety protocols.

The Project Manager will be responsible for planning, designing, procurement, installation, and commissioning of C & I projects, liaisoning for statutory approvals. 

Company Profile

comapny is in to the manufacturer and global supplier of TopEVA™- an advanced cost effective solar encapsulants providing long term durability, improved efficiency and high performance to solar modules. We are the pioneer and the largest encapsulant film manufacturer in India and TopEVA™ films are used by the reputed solar module companies in India, China, Japan, Taiwan, Malaysia, Germany, Spain, US and all other major markets across the globe.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs