1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
1. Key SLD, Protection & Metering SLD
2. Design Basis Reports
3. Sizing calculations / Equipment selection
4. System studies using ETAP
5. Protection, Synchronisation, Control & Metering scheme drawings of Generators, Transformers, Switchgear, Switchyard, Reactors and Lines
6. Networking architecture including IEC61850
7. Relay setting calculation and Parameterisation
8. Control interfaces with DDCMIS, EDMS, ECP
9. Cable ...