1 Opening(s)
0 To 1.0 Year(s)
1.08 LPA TO 1.20 LPA
Field operators generally start up and stop equipment, take pressure and flow readings, compute and record data, adjust valves/pressures, and examine and repair equipment. Like a plant operator, they may also deal with compressors or dehydrators within their field run.
Field operators generally start up and stop equipment, take pressure and flow readings, ...
4 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 18.00 LPA
Field Operator Job Description Template
Our company is looking for a Field Operator to join our team.
Responsibilities:
Working and traveling to various well sites, sand mines, and transloading facilities;
Operation of a wellsite proppant storage system;
Ability to provide the proper delivery of mix to the blender equipment;
Unloading of hauling trailers;
Hands-on operation of all ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Description:
Job Description of 2nd class Boiler Operator:
Responsible for operation of Boiler,Biomass boiler DM/Power Plant .WHRB Boiler including de-aerator operations Steam turbines and steam networksResponsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over after maintenance Issuance of ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
Job Description :- Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC etc.
A turbine DCS operator may perform the following duties:
Design, install, maintain, and troubleshoot the DCS
Maintain and repair instrument and control system equipment
Record ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Description:
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
4 Opening(s)
3.0 Year(s) To 8.0 Year(s)
1.80 LPA TO 2.40 LPA
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Description:
Boiler first class operators take responsibility for the operation, servicing, and repair of high pressure steam boilers, pumps, motors, oil heaters, gas controls, emergency power generators, coal stokers, fly ash arresters, forced draft systems, safety devices, turbines, boiler controls, and recording devices.
Boiler first class operators take responsibility for the operation, ...
3 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.00 LPA
Job Location:-West Africa Nigeria
Candidate must have sound knowledge of CFBC boiler field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Preferably candidate must possess 1st class or 2nd class Boiler Attendant Certificate Holders.
2 Responsible for performing Boiler field activities safely.in designated shift 3 To ensure the ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
Responsibilities:
Equipment Operation:
Operate and control power generation equipment, including boilers, steam turbines, generators, pumps, and auxiliary systems, to produce electricity according to demand and grid requirements.
Monitor equipment parameters, such as temperature, pressure, flow rates, and power output, using control systems and instrumentation to ensure efficient operation.
Start-up and Shutdown Procedures:
Execute start-up and ...