1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
Prepare Calibration Schedule yearly with monthly as per plant wise
2) Master Instruments Calibration Maintain by Authorized party
3) Attend the break down as like Sox, NOx, Cox, PM2 sensor working
4) Check the PLC/ SCADA System to Field Instruments with feedback signal.
5) Energy Saving by Process control with new concept
6) Maintain the ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.00 LPA TO 2.50 LPA
of Preventive Maintenance as per scheduled.
Spare Parts Planning and Maintaining of key Spares for reducing the Breakdown trends. Injection molding , blow molding, PVC coating machine, water circulation plant Utility machine.
Clint meeting, AMC documentation VRB system, DG set, Fire safety system
Continual improvements to minimize the Breakdowns and maintenance cost by ...