1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
14.00 LPA TO 14.00 LPA
Civil Lead- Wind turbine infrastructure development, Road development for Wind turbine, Strong experience in WTG foundation, Crane Basepad prepration + Machine Management, 220 kV/ 400 kV TL foundation experience, Statutory Approvals, Bay erection
Principle Accountabilities:
• Engineering drawings to be provided and compliance to the same as per engineering process. Maintaining Proper ...
4 Opening(s)
4.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 15.00 LPA
Civil Eng - Wind turbine infrastructure development, Road development for Wind turbine, Strong experience in WTG foundation, Crane Basepad preparation,
Good to have - Material shifting experience from store to WTG foundation area
Principle Accountabilities:
• Engineering drawings to be provided and compliance to the same as per engineering process. Maintaining Proper Drawings, ...
1 Opening(s)
2.0 Year(s) To 10.0 Year(s)
1.00 LPA TO 4.00 LPA
Plasma Operator
Company: Kaushik Engineering Works Location: Ahmedabad, Gujarat Website:https://www.kaushikengineeringworks.com/
About the Company
Kaushik Engineering Works is a leading manufacturer of road construction equipment such as Asphalt Drum Mix Plants, Asphalt Batch Mix Plants, Concrete Batching Plants, Bitumen Pressure Distributors, and other infrastructure machinery used in highway and road development projects. The company ...