HELPER FOR BOILERS INDUSTRY - RAIPUR , CHHATTISGARH
1 Nos.
132389
Full Time
2.0 Year(s) To 3.0 Year(s)
1.20 LPA TO 1.60 LPA
Steel/Metal/Iron/Non-ferrous
10th / SSC - Not Applicable / No Specialization; 12th / HSC - Other
Job Description:
A Boiler Helper supports Boiler Operators and technicians by maintaining, cleaning, and repairing boiler systems, fuel-handling equipment, and surrounding areas. Key responsibilities include operating heavy equipment, assisting with, and performing manual labor tasks such as ash disposal, tube cleaning, and site maintenance to ensure safe, efficient operations.
Core Responsibilities
- Maintenance & Cleaning: Clean/lubricate boilers, tubes, and auxiliary equipment; clear ash, debris, and clogged fuel lines using hand tools.
- Operational Support: Assist operators with monitoring boiler water levels, fuel feeds (sawdust, bark), and chemical levels.
- Material Handling: Load, move, and store materials used in boiler repair, including handling insulation for boiler covering.
- Site Safety & Logistics: Adhere to strict safety protocols, keep work areas clean, and operate forklifts or front-end loaders.
- Assistance: Support mechanics in installing burners and repairing boilers, tanks, and vessels.
Qualifications & Requirements
- Experience: Entry-level position, though prior experience with machinery or industrial cleaning is preferred.
- Physical Ability: Capacity to lift \(50\text{ lbs}\) occasionally and \(20\text{ lbs}\) repetitively, plus ability to work in high-temperature or outdoor environments.
- Skills: Ability to follow detailed technical instructions and use basic hand/power tools.
- Licensing: Some roles may require, or offer training towards, specialized boiler attendant licenses depending on local regulations.
Common Job Titles
- Boiler Operator Helper
- Boilermaker Helper
- Boiler Room Helper
- Boiler Mechanical Helper
JOB APPLY
http://jobs.vinayakjob.com/
CONTACT DETAILS -
Name - NAMRATA
Number - 91099 99660
Mail id - namrata@vinayakjob.com
Company Profile
(Manufacturing unit) for Boiler pressure components like Bed Coils with Studs, Economizer coils, Evaporator Coils, Super Heater Coils, Distribution Stream Header etc., based at Raipur (C.G) from 2008. We are an approved vendor for Tata Projects Ltd. We also take up complete plant erection (for relatively smaller plants) up to 45 MW power plants jobs involving, Design Engineering, Supply & Erection of IBR / Non-IBR pipelines --- related equipment required for the particular project.
Apply Now
- Interested candidates are requested to apply for this job.
- Recruiters will evaluate your candidature and will get in touch with you.