FITTER- POWER PLANT

FITTER - POWER PLANT

1 Nos.
15740
Full Time
2.0 Year(s) To 5.0 Year(s)
1.00 LPA TO 1.20 LPA
Production / Quality / Maintenance
Steel/Metal/Iron/Non-ferrous
ITI - Fitter
Job Description:

URGENT REQUIREMENT FOR FITTER FOR REPUTED POWER PLANT AT RAIPUR LOCATION.URGENT REQUIREMENT FOR FITTER FOR REPUTED POWER PLANT AT RAIPUR LOCATION.

URGENT REQUIREMENT FOR FITTER FOR REPUTED POWER PLANT AT RAIPUR LOCATION.

URGENT REQUIREMENT FOR FITTER FOR REPUTED POWER PLANT AT RAIPUR LOCATION.URGENT REQUIREMENT FOR FITTER FOR REPUTED POWER PLANT AT RAIPUR LOCATION.

 

 

 

CONTACT - ANJALI 95034 51559

      JOB APPLY 

 http://jobs.vinayakjob.com/

Company Profile

5.0 MVA (SAF) to produce 7200TPA equivalent of SiMn. Its Installed Capacity is 26.6 MVA equivalents of 61500 TPA of FeMn while power generation capacity is 20MW for thermal, 8.5 MW for the biomass base plant and 1.5MW for windmill energy that makes one third of the green energy produced. The company has initiated the Installation and expansion of Wind Mill Power Generation units across the Indian States. It has earned a clientele of highly reputed brands across the country.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

GM/VP - (Raw Materials for coal purchase) - RAIPUR
GM/VP,General Manager,Vice President,PURCHASE
CHEMICAL ENGINEER - URLA RAIPUR
CHEMICAL ENGINEER,CHEMICAL TESTING
QUALITY SHIFT INCHARGE (Conveyor Belt) - RAIPUR
QUALITY SHIFT INCHARGE ,Conveyor Belt
METAL YARD SUPERVISOR - RAIPUR
METALYARD SUPERVISOR,SUPERVISOR,METALYARD SUPERVISOR
ASSISTANT ENGINEER (E & I) - RAIPUR
ASSISTANT ENGINEER,ELECTRICAL & INSTRUMENT,electrical & instrumentation