FITTER - POWER PLANT

FITTER - POWER PLANT

3 Nos.
51626
Full Time
5.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 2.50 LPA
Production / Quality / Maintenance
Power/Energy - Solar/Wind/Hydro/Nuclear
ITI - Fitter
Job Description:

Urgent Requirement for fitter for reputed biomass power plant.BIOMASS POWER PLANT AT MUGELI/BILASPUR. Candidate should have ITI qualification and 5 year experience as Fitter in a power plant experience

5+ years of relevant experience in POWER PLANT as a Fitter Should be able to design tools and should be result oriented with time limit.o Minimum 5 to 6  years of Industry experience in placing and aligning the machines at certain level as per industry standards.

 

CALL FOR MORE DETAIL 

M/S GUDIYA 9109993516

MAIL YOUR CV gudiya@vinayakjob.com

Through click & Download App
https://play.google.com/store/apps/details?id=com.vinayakjob.jobseeker
 LOADING UNLOADING SUPERVISOR

Company Profile

Manufacturer of sponge iron , M. S. Billet , waste heat recovery boiler etc.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

RIGGER - RAIGARH
Rigger,Maintenance
EOT CRANE OPERATOR - RAIGARH
EOT CRANE OPERATOR,EOT,EOT CRANE
GRINDER - RAIGARH
GRINDER ,ITI ,STEEL PLANT ,POWER PLANT
WELDER (SMAW / FCAW / SAW) - RAIGARH
WELDER ,SMAW WELDER,SMAW,STEEL PLANT ,POWER PLANT,SPONGE IRON
TACK WELDER (HELPER) - RAIGARH
welder ,tack welder,iti,power plant ,steel plant ,production