INSTRUMENT ENGINEER - POWER PLANT

INSTRUMENT ENGINEER - POWER PLANT

3 Nos.
67816
Full Time
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 3.00 LPA
Production / Quality / Maintenance
Oil and Gas/Petroleum
ITI - Instrument Mechanic
Job Description:

Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.

Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.

Company Profile

5.0 MVA (SAF) to produce 7200TPA equivalent of SiMn. Its Installed Capacity is 26.6 MVA equivalents of 61500 TPA of FeMn while power generation capacity is 20MW for thermal, 8.5 MW for the biomass base plant and 1.5MW for windmill energy that makes one third of the green energy produced. The company has initiated the Installation and expansion of Wind Mill Power Generation units across the Indian States. It has earned a clientele of highly reputed brands across the country.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs