PULPIT OPERATOR ROLLING MILL FOR STEEL INDUSTRY - RAIGARH , CHHATTISGARH
Job Description:
- Machine Operation: Set up, operate, and monitor rolling mill equipment (shears, furnaces, CNC) from the control pulpit.
- Parameter Control: Adjust machine settings (speed, temperature, tension) based on production schedules, work orders, and process sheets.
- Quality Assurance: Monitor product quality via HMI/cameras, ensure specifications are met, and perform adjustments to correct deviations.
- Production Monitoring: Track steel movement, manage grade changes, and ensure material availability.
- Troubleshooting: Identify and diagnose equipment issues, alarms, or potential failures, taking corrective action or escalating to maintenance/supervisors.
- Safety & Compliance: Enforce safety protocols, ensure equipment safety features work, and maintain a clean work area.
- Communication & Documentation: Coordinate with floor crew, maintenance, and control rooms; maintain production records and update SAP data.
- Basic principles of rolling mill automation and operations.
- Ability to read and interpret production schedules and technical documents.
- Strong computer skills (HMI, basic software).
- Excellent communication and coordination.
- Attention to detail and problem-solving.
- Experience as a Pulpit Operator in a steel or rolling mill setting.
- Education often includes B.Sc. (PCM) or relevant technical background.
JOB APPLY
http://jobs.vinayakjob.com/
CONTACT DETAILS -
Name - MANISHA SAHU
Number - 9109993513
Company Profile
Existing plant of 33,500 TPA of MS Ingots (only 16,750 TPA is commissioned) & 4800 TPA
of TMT Bar has obtained Consent from Regional Office - Raigarh, Chhattisgarh
Environment Conservation Board (CECB) vide letter no. 153/RO/TS/CECB/--- Raigarh
dt. 16th May ---.
? Obtained Environment Clearance for 90,000 TPA Sponge Iron, 33,500 TPA to 1,23,500
TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill, WHRB Power
Plant (6 MW) & FBC Power Plant (12 MW) from MoEF, New Delhi vide F.No. J11011/308/2009/ IA II (I) dated 29th March 2011& 9th July 2018 (Validity Extension).
? Obtained Consent for Establishment for 90,000 TPA Sponge Iron, 33,500 TPA to
1,23,500 TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill,
WHRB Power Plant (6 MW) & FBC Power Plant (12 MW) from CECB vide
4291/TS/CECB/2014 dated 21st October 2014.
Apply Now
- Interested candidates are requested to apply for this job.
- Recruiters will evaluate your candidature and will get in touch with you.