ELECTRICAL TECHNICIAN (POWER PLANT)- RAIGARH

ELECTRICAL TECHNICIAN (POWER PLANT)- RAIGARH

1 Nos.
77137
Full Time
1.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Steel/Metal/Iron/Non-ferrous
Diploma - Electrical; Diploma - Mechanical; ITI - Electrician
Job Description:

 

JOB DESCRIPTION:

Electrical technicians work in offices or factories, either supervising electricians or as part of a production team. Electrical technicians follow a device's design plan, inspect, construct, and repair electrical systems.

We are looking for an experienced electrical technician to evaluate, assemble, and maintain electrical systems in equipment which are predominantly portable. The electrical technician does not design electrical systems but will identify potential problems in design.

To be successful as an electrical technician, you should be able to read electrical system design plans and recommend improvements, as well as calibrate instruments, and diagnose faulty equipment.

Electrical Technician Responsibilities:

  • Assembling, evaluating, testing, and maintaining electrical or electronic wiring, equipment, appliances, and apparatus.
  • Troubleshooting and repairing malfunctioning equipment, appliances, and apparatus.
  • Constructing and fabricating parts, using hand tools and specifications.
  • Reading and interpreting electrical and electronic circuit blueprints, diagrams, and schematics.
  • Advising management on continued use of unsuitable equipment, appliances, and apparatus.
  • Supervising electricians.
  • Ordering of electrical supplies and equipment.

 

 

 JOB APPLY 

 http://jobs.vinayakjob.com/

 

MANISHA SAHU 9109993513

Company Profile

Existing plant of 33,500 TPA of MS Ingots (only 16,750 TPA is commissioned) & 4800 TPA
of TMT Bar has obtained Consent from Regional Office - Raigarh, Chhattisgarh
Environment Conservation Board (CECB) vide letter no. 153/RO/TS/CECB/--- Raigarh
dt. 16th May ---.
? Obtained Environment Clearance for 90,000 TPA Sponge Iron, 33,500 TPA to 1,23,500
TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill, WHRB Power
Plant (6 MW) & FBC Power Plant (12 MW) from MoEF, New Delhi vide F.No. J11011/308/2009/ IA II (I) dated 29th March 2011& 9th July 2018 (Validity Extension).
? Obtained Consent for Establishment for 90,000 TPA Sponge Iron, 33,500 TPA to
1,23,500 TPA of MS Billets, 90,000 TPA TMT Bars / Structural --- / Wire Rod Mill,
WHRB Power Plant (6 MW) & FBC Power Plant (12 MW) from CECB vide
4291/TS/CECB/2014 dated 21st October 2014.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs