5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Hand on experience on Plant machinery maintenance .
Sound knowledge on Preventive Maintenance, Corrective Maintenance and Shutdown Activities.
Maintenance works for various Mechanical rotating and static equipment’s like Air compressor, Air Dryer, Cooling Tower etc.
Maintenance work of Pumps, Blower, Agitator, Heat exchanger, Valves, Vessels, Steam & pipelines of Metallic and Non-Metallic MOC.
Compressor, ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Hand on experience on Plant machinery maintenance .
Sound knowledge on Preventive Maintenance, Corrective Maintenance and Shutdown Activities.
Maintenance works for various Mechanical rotating and static equipment’s like Air compressor, Air Dryer, Cooling Tower etc.
Maintenance work of Pumps, Blower, Agitator, Heat exchanger, Valves, Vessels, Steam & pipelines of Metallic and Non-Metallic MOC.
Compressor, ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 6.50 LPA
Hand on experience on Plant machinery maintenance .
Sound knowledge on Preventive Maintenance, Corrective Maintenance and Shutdown Activities.
Maintenance works for various Mechanical rotating and static equipment’s like Air compressor, Air Dryer, Cooling Tower etc.
Maintenance work of Pumps, Blower, Agitator, Heat exchanger, Valves, Vessels, Steam & pipelines of Metallic and Non-Metallic MOC.
Compressor, ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 13.00 LPA
Job Description:
CAPEX pproposal and designing of brown and green field projects.
Preparing Basic Engineering Package consisting design basis document, material balance, energy balance, Utility calculations, development of Process Flow Diagrams.
Development of P&IDs and layout.
Preparing process datasheet for equipment’s like batch reactors, agitators, vessel, ANF, RVD, pumps, heat exchanger, storage tanks etc.
Technical reviewing of GA ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Preparation and allotment of daily productions plans
Preparations of manufacturing plan
Ensuring procedures are carried out safely.
Study of drawings and fabrications of columns, tanks, vessels, heat exchangers, piping’s, skids, systems as per various
Co – ordination with quality department for shop inspections, NDT completions material clearances etc.
Co – ordinations with, Purchase, Planning, Quality, ...
4 Opening(s)
4.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
CAPEX pproposal and designing of brown and green field projects.
Preparing Basic Engineering Package consisting design basis document, material balance, energy balance, Utility calculations, development of Process Flow
Development of P&IDs and layout.
Preparing process datasheet for equipment’s like batch reactors, agitators, vessel, ANF, RVD, pumps, heat exchanger, storage tanks etc.
Technical reviewing of GA drawing for fabrication.
Reviewing techno commercial ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 4.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 1.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 8.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Preparation of bill of material as per drawing.
Drawing study and raw material planning and purchasing.
Shop Floor Production planning.
Handling Manpower independently.
In-process Stage inspection.
Distribution of Project wise equipment to contractors.
Witnessing PT Test, Hydro Test, and Welding Set up Inspection.
Witnessing Agitator Running trial.
Raw material Identification & Inward Inspection for production material.
Outsourcing, Vendor Inspection ...