1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 7.20 LPA
Job description
Lead a large team to achieve agreed productivity norms/targets. Smooth operations of the plant esply in Printing, Slitting & Lamination processes. reporting to head of ops should be capable of moving up the ladder as Head OPs in 3 yrs time.
Required Candidate profile
BE/CIPET/ Printing Technologist with a minimum 15 ...
10 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 4.20 LPA
Monitoring of Injection moulding m/c.
Hourly basis DPR updated.
m/c abnormality find out & take proper action .
Process parameter setting.
Responsible for all check sheet and report .
Responsible for part wise document on m/c.
Handling the manpower according to production planning.
Monitoring of Down Time and reduce it and standardize for every Break Down.
Responsible for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 10.00 LPA
Job description
Roles and Responsibilities
We are looking for Tool Room Engineer for our thin wall Plastic Containers Moulds Maintenance
1) Preventive Maintenance of all the Moulds.
2) Handling breakdown maintenance of moulds .
3) Coordinate with production department for Mould Issues Coordinate with mould manufacturer and tool room Manager for providing solutions to mould related issues.
4) Monitor ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
Roles and Responsibilities
Ensure safe working condition of all employees. If any unsafe activity observed immediately contact with production head and safety head.
2.To check all production as per standard.
of the product should be as per quality requirement.
To test daily production as per lab testing standard.
To ensure no production out of specification.
No ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 6.00 LPA
Roles and Responsibilities
Ensure safe working condition of all employees. If any unsafe activity observed immediately contact with production head and safety head.
2.To check all production as per standard.
of the product should be as per quality requirement.
To test daily production as per lab testing standard.
To ensure no production out of specification.
No ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.80 LPA TO 6.00 LPA
Job description
HPS-122
Production Supervisor
Male
1
4 to 8
B.Sc Polymer/Diploma Polymer/Plastic
Ensure safe working condition of all employees. If any unsafe activity observed immediately contact with production head and safety head.
2.To run all machines as per daily production plan (Quality of the product should be as per requirement).
To Achieve daily production target.
To ensure wastage it ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
Roles and Responsibilities
HPS/2024/240 HPS-2023/123
Quality In Charge
Male
1
3 to 5
B.Sc Polymer/Diploma Polymer/Plastic
Ensure safe working condition of all employees. If any unsafe activity observed immediately contact with production head and safety head.
2.To check all production as per standard.
of the product should be as per quality requirement.
To test daily production as per lab testing ...
15 Opening(s)
0 To 1.0 Year(s)
1.40 LPA TO 1.80 LPA
Role - Trainee Engineer
Industry Type - Plastic / Rubber
Functional AreaProduction, Manufacturing, Maintenance
Employment Type -Full Time
Role CategoryOther
Education -B.E (Mechanical)/ B.E (Electrical)/ Diploma (Mechanical )/ Diploma (Electrical)/ B.Sc(CIPET).
Salary Range - 12000 To 15000
Exp - 0 to 1 (Fresher Candidate require )
Duty Hours - 8 Hours duty.
Other Facilities - PF /Bonus / Bus / Canteen ...
1 Opening(s)
20.0 Year(s) To 22.0 Year(s)
15.00 LPA TO 25.00 LPA
1). Manage operations to deliver timely as per customer demand
2). Consistent improvement in OEE as per targets defined
3). Problem solving of the teams – Maintenance, Tool room, Quality, Plant HR, Production
4). Contribution in profits through efficient manufacturing in the plant
5). Plan capacities well in advance & contribute to enhance ...
2 Opening(s)
7.0 Year(s) To 8.0 Year(s)
9.00 LPA TO 10.00 LPA
Plan and organize production, mould/die change schedule & Re-negotiate as necessary to ensure maximum performance and minimum delay. Determine manpower, equipment and raw materials needed to cover required production • Schedule shift as per production needs, monitor jobs to ensure they will finish on time and within budget. • Ensure ...