6 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 2.16 LPA
Urgent Requirement for Entry Line pipe division for Reputed Steel Plant at Raipur
Entry Line :- the coils are opened, edge milled to required width and fed to forming stand at uniform speed. ... Hthe strip is formed to required size of the pipe & spirally welded.dle
Entry Line :- the coils are opened, edge milled ...