1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 8.40 LPA
Urgent Requirement AGM E&I-AGM E&I-(POWER PLANT) for Reputed POWER PLANT At Anuppur (M.P) location for Selecting control schemes, identifying appropriate system, handling enquiry specifications and selecting instruments as per type of application; managing the process instrumentation to optimise productivity; Used Emerson’s/Rosemount/Honeywell/Siemens etc. Make
Understanding the technical & functional specifications.Executing predictive & preventive ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.00 LPA
B.E/Diploma (Mech.) with 5 to 10 years experience as a DCS Engineer in a Power Plant in operation.
Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC etc.To be familiar with all equipment in plants, maintain all maintenance equipments accurate documents ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.20 LPA
We are looking for Shift Incharge-Operations in .Biomass Power Plant at ANUPPUR Location. Manage operations at biomass power generation facilities. Direct work activities at plant, including supervision of operations and maintenance staff. 1) Test, maintain, or repair electrical power distribution machinery or equipment, using hand tools, power tools, and testing ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
Urgent Requirement oF ELECTRICAL & Instrument TECHNICIAN for Power Plant at Anuppur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.
Duties include installing, inspecting, maintaining, operating, troubleshooting, repairing, and calibrating various ...