3 Opening(s)
5.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 2.50 LPA
Urgent Requirement for fitter for reputed biomass power plant.BIOMASS POWER PLANT AT MUGELI/BILASPUR. Candidate should have ITI qualification and 5 year experience as Fitter in a power plant experience
5+ years of relevant experience in POWER PLANT as a Fitter Should be able to design tools and should be result oriented with ...
6 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.00 LPA TO 3.00 LPA
Description:
Urgent Requirement for Electrical Engineer for Reputed Biomass power plant As a member of the Operations & Maintenance Team you will provide electrical engineering support in order to deliver the operational, technical and commercial targets of the business.
By providing your electrical engineering expertise, you can expect to be involved in ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.20 LPA
We are looking for Shift Incharge-Operations in .Biomass Power Plant at ANUPPUR Location. Manage operations at biomass power generation facilities. Direct work activities at plant, including supervision of operations and maintenance staff. 1) Test, maintain, or repair electrical power distribution machinery or equipment, using hand tools, power tools, and testing ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
Urgent Requirement oF ELECTRICAL & Instrument TECHNICIAN for Power Plant at Anuppur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults or arranging for replacements to be installed. Keeping Faculty in-charge informed of progress.
Duties include installing, inspecting, maintaining, operating, troubleshooting, repairing, and calibrating various ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
12.00 LPA TO 18.00 LPA
The Power Plant Head is responsible for leading and managing projects and operations from conception to completion.
POWER PLANT HEAD MUST BE HAVING EXPERIANCE IN THERMAL & BIOMASS POWER PLANT
Key job responsibilities include:
Project Planning: Develop project plans, timelines, and budgets.
Team Management: Lead a team of engineers, technicians, and contractors.
Design and Engineering: ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.20 LPA TO 1.44 LPA
Description:
Urgent Requirement for Electrical Engineer for Reputed Biomass power plant As a member of the Operations & Maintenance Team you will provide electrical engineering support in order to deliver the operational, technical and commercial targets of the business.
By providing your electrical engineering expertise, you can expect to be involved in ...