1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Description
24.10.24
HPS/2024/682
PPC Female
Female
1
1 to 3
BA/B.com/Com
1-Work out for develop process improvements for inventory, manufacturing and production controlsystem.2-plan schedule and monitor material movement in production cycle to insure continuous operations3-Work out with RM Department for material resource planning and analysis to reduce inventory level4-Work Out For Monitor inventory status and generate inventory ...
10 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Profile:
Maintenance of galvanizing line.
Maintenance of Maintenance of D.C. machines (up to 1600 KW DC motor.)
Maintenance of Maintenance of A.C motor (2500 KW AC motor.)
Maintenance of DC & AC Drives, power & auxiliary panels.
Maintenance of roll grinding machine
Attending Breakdown maintenance & shutdown maintenance.
Maintaining Safety aspects & House Keeping of the line.
Maintenance of crane.
Making technical Specifications and technology appraisal for plant equipment and utilities.
Maintenance of Ac Drive, Dc Drive like ABB, Allen Bradley, Siemens micro Master Drive, Tele mechanique Drive
BRM & WRM Electrical Maintenance
Successfully completed BAR MILL Project
Erection & commissioning of MCC,PCC, Transformers Drives
Control wiring from RIO to Field - Proxy, HMD and solenoid valves..
Did the communication wiring & Control wiring.
MCC Control wiring & RIO'S Termination & Cabling
AC motors installation & maintenance.
Encoders Cabling & Termination
OS Internal/External wiring
Wiring of Siemens PLC S7-400
Handled wiring of field devices like control valves, flow meters.
Looked after power cable laying & termination for power distribution panels (PCC & MCC), motors, transformers, Ac drives and HT panels. And control cables for PLC, RIO'S and various field equipment
Coordinated with SIEMENS & MORGAN for Commissioning of Bar Rod Mill
Hydraulic and Lubrications motor maintenance
EOT cranes & Magnetic cranes, Electrical maintenance & Troubleshooting
Job Location: Chitegaon MIDC, Aurangabad Maharashtra
For more details call on 7249840333 / 9765567506
Send CV on career@paradiseplacement.co.in
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Position: Asst. Manager - Electrical
Location: Daman
Experience: 4 - 5 Years
Industries: Pharma Formulation
Responsibilities:
Ensure uninterrupted power supply to all production and critical utility areas
Maintain HT/LT panels, transformers, DG sets, UPS, PCC/MCC systems
Execute preventive and breakdown maintenance of electrical equipment
Troubleshoot electrical faults and ...
1 Opening(s)
2.0 Year(s) To 12.0 Year(s)
2.40 LPA TO 10.80 LPA
Job Summary:
Responsible for leading estimation, costing, and pricing activities to ensure accurate quotations and profitable project execution for electrical panel manufacturing.
Key Responsibilities:
Review and analyze RFQs, specifications, SLD, GA drawings
Lead preparation and validation of BOM and costing sheets
Finalize pricing strategy and marginin coordination with management
Guide estimation team for accurate and timely ...
1 Opening(s)
5.0 Year(s) To 12.0 Year(s)
4.00 LPA TO 6.00 LPA
🔹 Key Responsibilities
âš¡ Electrical Maintenance
Perform routine and breakdown maintenance of electrical systems
Handle HT/LT systems (11/33/66 KV)
Operate and maintain DG sets, UPS, PCC/MCC panels
Troubleshoot power and control circuits
Maintain motors, starters (DOL, Star-Delta, F/R), and VFDs
🛡 Safety & Compliance
Follow all safety standards and procedures (LOTO system)
Ensure compliance with statutory and company safety ...
2 Opening(s)
8.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
Position: Asst./Dy. Manager - Electrical
Location: Hajipir - Kutch
Experience: 8 - 10 Years
Industries: Chemical
Responsibilities:
Maintenance & Operations
Plan and execute preventive, predictive, and breakdown maintenance
Maintain:
Motors (HT/LT)
Transformers
Switchgear (HT/LT panels)
MCCs (Motor Control Centers)
VFDs and soft starters
Ensure maximum equipment uptime and reliability
Troubleshooting & Breakdown Handling
Diagnose electrical faults quickly
Implement corrective actions
Lead emergency repairs to reduce ...
3 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
JD :
Install and lay power cables (copper & aluminium) in trench, ducts, and cable trays.
Modify and replace SFU/MCCB panels (32A–800A).
Troubleshoot DOL & Star-Delta starters (2HP–40HP).
Install earthing strips and complete proper grounding work.
Perform wiring, conduit installation, cable dressing, and fixing of switch sockets (domestic & industrial).
Carry out preventive maintenance of MCC ...
3 Opening(s)
4.0 Year(s) To 8.0 Year(s)
6.00 LPA TO 7.20 LPA
Key Responsibilities
Electrical System Design (HT/LT)
Understand project requirements, client specifications, and electrical load demands.
Perform electrical load calculations and prepare power distribution schemes.
Design HT/LT distribution systems including transformers, panels, and switchgear layouts.
Develop lighting layouts (internal & external), emergency lighting, earthing & grounding systems, and lightning protection systems.
Selection and sizing of equipment ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
2.00 LPA TO 8.00 LPA
2. Position: Electrical Design EngineerNo. of Positions: 1Qualification: Diploma / BE / BTech (Electrical / Electronics)Experience: 2–5 years (flexible based on skills)Salary: Based on experienceJob Location: Jetalpur, Ahmedabad
Key Skills:Electrical control panel design (Power & Control panels, MCC, PCC, VFD, Soft Starter, PLC, RIO panels)Understanding of SLDs, wiring diagrams, and GA ...