2 Opening(s)
0 To 1.0 Year(s)
1.44 LPA TO 2.40 LPA
Required Industrial Engineering Automation Engineer for SPM Manufacturer in Aurangabad
Education : BE Electrical / Electronics
Experience : 0 to 1 Years
Skills : Knoweledge in Panel Wiring, PLC , SCADA, Automation will be Preferred
1.PLC Programming
2.SCADA
3.HMI
4.Applied Industrial Pneumatics And Hydraulics
5.AC Drive
6.Robotics
7.Mechatronics Kit
8.Theoretical Knowledge Sensor & Transduce
Salary : up to 2.40 Lac(s)
Job Location : Waluj MIDC , Aurangabad
For more details Call on 9765567699
4 Opening(s)
1.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.60 LPA
Key Responsibilities
Installs power supply wiring and conduit for newly installed machines and equipment such as robots, conveyors programmable controllers, relay logic, etc.
Connects power supply to machinery and equipment and connects interface wiring between machinery and equipment
Diagnoses apparatus such as transformers, motors and light fixtures and replaces damaged or broken wiring ...
4 Opening(s)
1.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.60 LPA
Key Responsibilities
Installs power supply wiring and conduit for newly installed machines and equipment such as robots, conveyors programmable controllers, relay logic, etc.
Connects power supply to machinery and equipment and connects interface wiring between machinery and equipment
Diagnoses apparatus such as transformers, motors and light fixtures and replaces damaged or broken wiring ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.40 LPA
Hiring for Spring Manufacturing Industry
Position: Electrical Maintenance Engineer
Education: Diploma / BE Electrical
Experience: 2 to 5 Years in the Machine shop, spring
Salary: up to 18,000/- PM
Job Responsibilities : -
Attending all Breakdown & Trouble Shooting in the shift.
To deals with any modification of the machine.
Responsible for analyzing data of equipment control ledger for maintenance cost reduction.
Updating documents such as PM Check sheet, M/C History card, and M/C equipment control
Ledger, B/D History card, critical spare part lists, Power consumption report, Diesel consumption report
Maintenance of Hot water Generator, ETP, Electroplating, Powder Coating M/C, Pretreatment Line, Fatigue M/C, CNC Coiling ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 3.00 LPA
Post :
Mechanical Maintenance Engineer - 03
Electrical Maintenance Engineer - 03
Education: BE/ Dip (Mech & Electrical)
Experience: 2-4 years
Keywords: Fabrication / Weld Shop department experience candidates should be preferred
Experience in teaching & programming an ABB, Panasonic robot.
Trouble-shooting & modification of Allen-Bradley Control Logix PLC programs, Mitsubishi PLC program.
Good knowledge of Allen- Bradley PLC5, SLC.
Working on ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 8.00 LPA
Post : Plant Maitenance Manager
Education : BE Electrical or Mechenical
Salary : up to 8 Lac(s)
Job Profile :
Plant Maintenance
Hand on CNC, VMC, HMC machine, Convention machines – SPM. Troubleshooting.
Works on Fanuc, Siemens, PLc Drive, Mitsubishi,
Updating document such as PM Check sheet, M/C History card,
PLC Programming. (Messing, Mitsubishi)
Maintenance Documents, PM,BD, TS Documents
AMS & ...
3 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Interview Date : 06/06/2018 to 8/05/2018
Post :
1.Maintenance Engineer Electrical - 02
Salary : upto 3.60 Lac(s)
Education : Diploma Electrical / BE Electrical
Job Profile :
1. Maintenance Electrical Engineer
1) Hand on CNC, VMC, HMC machine, Convention machines – SPM. Troubleshooting.
Works on Fanuc , Siemens, PLc Drive, Mitsubishi,
2) Updating document such as PM Check ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
As requested, please find below the Job Description for Project Engineer role:
Job Description:
Act as the direct liaison with clients regarding all technical issues.
Maintain technical compliance with project specifications and standards.
Responsible for detailed engineering tasks including system architecture, Functional Design Specifications (FDS), and design documentation for Control and Instrumentation (C&I) systems.
Oversee ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...