1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 7.00 LPA
To independently prepare cost estimation for all Electrical LT Panels.
To prepare the Basic engineering package (SLD diagram, basic layout of the proposed plant)
To prepare the APFC Panel costing various voltages.
To prepare the RTAPFC Panel costing various voltages.(Thyristor based panels)
To prepare the costing of all MCC, IMCC, SOFSTARTER BASED Panels & ...