1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
20.00 LPA TO 20.00 LPA
Site Assessment & Preparation - Evaluate site conditions, Coordinate geotechnical and hydrological studies
Evaluate foundation options for solar panel mounting structures (e.g., driven piles, ground screws, concrete foundations)
Perform soil testing and analysis
Re-Engineering of Wind Turbine Generator(WTG) Foundation as per Site Specific condition
SOP for Pile Load Test as per IS 2911 with ...