1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
18.00 LPA TO 18.00 LPA
Principal Accountability/ Key Result Areas
Supporting Actions (Max 1325 characters for each KRA)
End-to-End System Design & Engineering Review
Lead the design and engineering review for EHV Transmission Lines (up to 400kV), 33kV Wind & Solar EBOP, and Substations.
Validate SLDs, layout drawings, earthing, lightning protection, and auxiliary systems.
Ensure designs are robust, optimized, and aligned with ...