72 Job openings found

1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
Qualification; Diploma/Degree in Electronic, Electrical, Instrumentation engineeringExperience: min 3+ years in Sales of VFDRequire candidates those are working in Channel partners or System House for selling of VFD Drive for brands Siemens, Schindler, "doom fox", ABB, Delta etc..Work location: Bhubaneshwar.Salary: Negotiable for right candidate Job profile:Identify and report relevant market development, competition ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
0.00 LPA TO 0.00 LPA
Qualification: Any Graduate, ITI, Diploma with experience in Robotic weld programming & Setup, robot maintenance. Job Description:Robotic welder/ Programmer to weld sheet metal and structural components to specifications provided. Job responsibilities include, but are not limited to, fixture setup, tacking components, monitoring and feeding robotic welder, maintaining quality of weld and ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
Not Disclosed by Recruiter
Qualification : Diploma or BE in Electronic, Electrical or Instrumentation. Exp: 3 to 10 yrs. experience in sales & marketing of VFD. Especially handling spares in Pune region Salary: Negotiable for right candidate Job Description:Experience in sales & marketing of VFD. Especially handling spares.Preferably candidates who are working with System Integrators of Rockwell, ABB, Siemens, ...
10 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Profile:   Maintenance of galvanizing line. Maintenance of Maintenance of D.C. machines (up to 1600 KW DC motor.)  Maintenance of Maintenance of A.C motor (2500 KW AC motor.)  Maintenance of DC & AC Drives, power & auxiliary panels.  Maintenance of roll grinding machine Attending Breakdown maintenance & shutdown maintenance. Maintaining Safety aspects & House Keeping of the line. Maintenance of crane. Making technical Specifications and technology appraisal for plant equipment and utilities. Maintenance of Ac Drive, Dc Drive like ABB, Allen Bradley, Siemens micro Master Drive, Tele mechanique Drive BRM & WRM Electrical Maintenance Successfully completed BAR MILL Project Erection & commissioning of MCC,PCC, Transformers Drives Control wiring from RIO to Field - Proxy, HMD and solenoid valves..  Did the communication wiring & Control wiring.                                                                              MCC Control wiring & RIO'S Termination & Cabling  AC motors installation & maintenance. Encoders Cabling & Termination  OS Internal/External wiring Wiring of Siemens PLC S7-400 Handled wiring of field devices like control valves, flow meters. Looked after power cable laying & termination for power distribution panels (PCC & MCC), motors, transformers, Ac drives and HT panels. And control cables for PLC, RIO'S and various field equipment Coordinated with SIEMENS & MORGAN for Commissioning of Bar Rod Mill       Hydraulic and Lubrications motor maintenance EOT cranes & Magnetic cranes, Electrical maintenance & Troubleshooting Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in  
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge    Education: DEE / BE Electrical    Experience: Min 6 Years in Rolling Mill / Steel Industry   Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section. Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up, Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section. Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant  Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems. Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby. Responsible for maintaining 5S activity & safety measures regularly To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG. Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus. Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill. Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant. Basic Knowledge about  Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation). Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder. Successfully  accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process To maintain records, logbook for the job carried out. Organize safety meetings & give on the Job training to my subordinates To ensure good housekeeping in the area and the shop floor. Take participate in IMS  internal audit  and prepare all supporting document To maintain a record of bypass of trip & interlock as per the procedures. Working on SAP (Plant Maintenance Module).   Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
1.80 LPA TO 3.60 LPA
Post: Maintenance Engineer or Senior Engineer   1. Mechanical Maintenance Engineer 01   2. Electrical Maintenance Engineer 02   Experience: 2 to 7 Years   Salary: 3.60 LPA   JOB RESPONSIBILITIES:-   Attending all breakdowns of machines, Equipment & its Rectification Handling & Maintenance of Air Compressor, Electrical Motors, Transformers, ACB Maintenance of Forging machines(1T,2T,3T,5T,8T, LASCO Belt drop), Forging Press(400 Ton, 500 Ton, 600 Ton), Cutting m/c. Handling breakdowns of Shot blasting m/c, Magnaflux m/c, Heavy Grinder, Heat Treatment Furnace (Oil & Induction), LT & Ht Panel.  Preventive Maintenance of all machines as per PM Schedule, Maintain history card & maintenance related data of Machine. Control Panel wiring, Maintain unity P.f. of the plant. Calculating MTTR, MTBF, Control the spares consumption. Knowledge of MCC Panel, PCC Panel & APFC Panel, PLC, PNP sensors Ensure availability of spare parts required for maintenance and raising PR Induction Billet Heater [Ibh] Coils Connection Robot Connectors And Working Trial Hoists Maintenance Replacing Faulty Limit Switches, Proxy PNP Sensors During Servicing Of Transformers Set Up Work And Dg Sets DM Water Plant, Cooling Towers Motors Connections During Changing Motors Heat Treatment Plant/Thermocouple  Taking Daily Readings Of Air Circuit Breaker, Vaccum Circuit Breaker, Ibh, Heat Treatment Plant And 33kv Ht Yard Job Location: Waluj MIDC, Aurangabad   Send CV on Career@paradiseplacement.co.in   for more details call on 9765567505  
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.20 LPA
  Designation : Machine Maintenance Engineer  Experience: 2 to 3 years in Plastic injection Molding Setup. Salary Range : 1.8-2.2 LPA Required Qualification -  BE or Equivalent. Job Desciption:  Maintenance of injection molding machine & SPM machine Execution of PM & PDM as per schedule, Analysis of breakdowns Execution of TPM &PM pillar Activities Energy saving project Attending major breakdown maintenance Handling documentation of executive & planned maintenance Execution of TBM CBM as per schedule Study of detoriotive components Applications of kaizen Troubleshooting and attending breakdown maintenance  Housekeeping maintenance related to department modification and spare management Implementing ISO/TS16949, 5’s and FORMELQ To improve machine uptime (MTBF) To improve machine repairs time (MTTR) Maintained machine history card To handle electrical supply system I.e.HT &Lt side  Maintenance of hydraulic system/ pneumatic system/ to develop ladder logic of PLC, AC, DC & Servo Drive Keeping spare in ready operational condition and maintenance of utility equipment Capable of handling electromechanical device Is. robot, chiller, ultrasonic welding m/c Presentation of monthly PRM Taking outside service appointment & spare management Recording Daily Activity Report for Meter Reading (main transformer, all panel) &Organize receivable &commercial Documents against invoice Working on welding machine, grinding machine, injection model and plastic mold Job Location : Waluj MIDC, Aurangabad For more details call on 9765567509  
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 3.00 LPA
Post : Mechanical Maintenance Engineer - 03 Electrical Maintenance Engineer - 03 Education: BE/ Dip (Mech & Electrical) Experience: 2-4 years            Keywords:  Fabrication / Weld Shop department experience candidates should be preferred  Experience in teaching & programming an ABB, Panasonic robot. Trouble-shooting & modification of Allen-Bradley Control Logix PLC programs, Mitsubishi PLC program. Good knowledge of Allen- Bradley PLC5, SLC. Working on ...
4 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 3.00 LPA
Position: Production Supervisor (4 No) Keywords: Fabrication / Weld Shop department experience candidates should be preferred  Educational Qualifications: Bachelor of Engineering in the stream of Mechanical. Or Diploma in Engineering in the stream of Mechanical Desired Experience: Up to 2 to 4 years experience in a Manufacturing company preferably in a Robotic Weld Shop Salary: ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 4.00 LPA
Position : Robot Programmer Company Description: Since its Inception in 1994, the Group has grown into a multi-location company from single unit, multiple product range from Automobile Ancillary to Home Furnishing.RGI entered in manufacturing in 1994 the group entered in “Metal Home Furnishing” articles .In financial year 2011-12, substantial export of @ 6 ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile