Description:
Description:
Supervisory Responsibilities:
Where applicable, directs and oversees junior or subordinate staff members regarding construction, operations, and/or maintenance tasks and assignments at a project site.
Duties/Responsibilities:
Consults with and provides guidance to project stakeholders and managerial staff regarding engineering requirements for construction of various designs, modifications, and structural repairs.
Uses design software and drawing tools ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.60 LPA TO 4.20 LPA
Supervisory Responsibilities:
Where applicable, directs and oversees junior or subordinate staff members regarding construction, operations, and/or maintenance tasks and assignments at a project site.
Duties/Responsibilities:
Consults with and provides guidance to project stakeholders and managerial staff regarding engineering requirements for construction of various designs, modifications, and structural repairs.
Uses design software and drawing tools ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
13.00 LPA TO 15.00 LPA
Position: Civil Manager
Location: Cuddalore - Tamil Nadu
Experience: 12- 15 Years
Industries: Chemical
Responsibilities:
Outlining, levelling as well as surveying the site.
Verifying plans, designs/drawings as well as quantities for accurateness of computations.
Making sure that the entire materials utilized as well as work conducted is ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Description:
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before ...
3 Opening(s)
5.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
Fujita Engineering India Pvt. Ltd.
Fujita corporation celebrates its 100th year in business. Fujita corporation is a Japanese Company. Fujita Corporation is active around the world and has local offices across Asia and in North America. Fujita Corporation will combine the knowledge of construction engineering cultivated in more than 100 years of corporate history.
Website - http://www.fujita.com
Designaion - AUTOCAD Draftman
Location - ...
2 Opening(s)
5.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 6.00 LPA
Should have experience on architectural or civil work.
Person has worked in an architect’s office
Must have proficiency on auto cad software.
Developing detailed working drawings from plan.
Making good presentation drawings.
Qualification: ITI Civil Draftsman / BE/B. Tech/Diploma (Civil)/ Diploma in Architecture Assistantship
Experience – 5 + years.
For more details call on 93776 77857 or ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 14.00 LPA
ESSENTIAL DUTIES & RESPONSIBILITIES
· Understanding Project Requirement as mentioned in WO/Awarded Contract and Tender documents
· Planning, Execution, Monitoring & Control of Project Activities on daily/weekly/monthly basis as per approved budget and schedule.
· Should be able to prepare rate analysis estimate for various construction activities.
· Should be able to source ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
4.00 LPA TO 6.00 LPA
Job Description:
Position: Civil Engineer
Location: Panoli, near by Ankleshwar
Experience: 2-6 Years
Industries: Pharma
Responsibilities:
Interpretation of Drawing
Preparing Bar Bending Schedule
Allotting Work to Labors
Supervision of Construction Work
Preparing Schedule of Material Used and Available
Plotting Line – Level on Construction Site
Preparing Work Chart Schedule
Checking Steel Work of Slab, Beam, & Column Before Concreting
Checking & Arranging Equipment Before Concreting ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.60 LPA TO 3.80 LPA
Manage, design, develop, create and maintain small-scale through to large-scale construction projects in a safe, timely and sustainable manner
Conduct on-site investigations and analyze data (maps, reports, tests, drawings and other)
Carry out technical and feasibility studies and draw up blueprints that satisfy technical specifications
Assess potential risks, materials and costs
Provide advice and ...