1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
8.00 LPA TO 9.00 LPA
Must have Good Exposure in Bulk Port/Coal/Steel / Copper / Aluminium Plant all Mechanical and Electrical Equipment of Erection Project for SUL, Convayor, Transfer Tower, Crusher, Pile, Stacker Reclaimer etc.
To Head the Total Plant’s Area wise Project Team in several Location and Optimize the Equipment and Manpower in all Form ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
8 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
10 Opening(s)
4.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.80 LPA
Responsible to check all the steps from beginning to end.
Responsible to report preparation of raw material like coal rake & iron ore rake.
Responsible for equipment health & maintenance.
preparing daily testing & MIS reports
Ensure proper house keeping of lab area.
collection of sample checking the quality & reporting the seniors
responsible implementing 5s ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipments Operation & Maintenence & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenence of electrical equipments like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.80 LPA TO 5.00 LPA
Ensure the Physical & Chemical Quality.
3) SMS Stock yard visiting for Dispatch and Physical Supervision
4) To ensure the inspection & testing of all Raw Materials related to.
5) To ensure the identification traceability of products with respect to heat, grade ...
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Quality Lab Chemist
Education: Bsc / Msc Chemistry
Experience: Min 5 Years in Steel Industry / Rolling Mill
Job Assignment in Lab :
• Checking the specification percentage in the coolant, measuring the oil concentration, Checking the Cl, Fe Percentage in mill Process, Inspection the Final Rolling On Mill Process.
•Checking the CGL Line Zink Bath Testing
•Daily Reporting Process Control, Reporting The SOP Process
•Working In 5 ‘S’ Process
Job Assignment in CGL line:
•Checking the steel sheet, Checking Hardness HRB & VPN, Bend testing, LFQ (long farming testing), measuring the thickness & width, Defects on Sheet, Checking the Zinc Coating, Checking The I Value.
•Clearing the Quality CGL Line in SAP
•Reporting the SOP Process
Job Assignment In CRM Line:-
•Checking the steel sheet, Checking Defects on Sheet, Measuring the thickness & width.
•Clearing the Quality CRM Line in SAP.
•Reporting the SOP Process.
Water Test: PH, Alkalinity Hardness, Conductivity, Chloride, HCN, Total NH3, Phenol, C.O.D., B.O.D.,D.O, Oil & Grease, Mlss, Mlvss, TDS, SS, Sulphaide, Phosphate.
By Product: Tar Moisture, Tar Dust & Tar Fog, TI, and BI.
Gas Analysis orsat apparatus CO2, CmHn, O2, CO, CH4, and H2.
Estimation of NH3, H2S, Naphtha.
Coke & Coal Ash: Estimation of Coke & coal ash:
SiO2, Al2O3, CaO, MgO.
Job Location: Chitegaon MIDC, Aurangabad Maharashtra
for more details call on 7249840333 / 9765567506