2 Opening(s)
20.0 Year(s) To 25.0 Year(s)
45.00 LPA TO 50.00 LPA
Academic Qualification: B.Tech Electrical / Electronic preferably M. Tech/MBA
General Work Experience: More than 20 Years
Experience in Railway/ Transportation / Infra structure projects: More than 15 Years
Experience in similar position: More then 5+ years
International Experience More than 5 years (Required: 5 years in International Experience with 2 Railway / Metro / ...
2 Opening(s)
5.0 Year(s) To 9.0 Year(s)
6.00 LPA TO 9.20 LPA
Minimum 5 years’ experience in High Rise Buildings, Infrastructure, Villas, Townships, Industrial projects etc.
The Construction Quality Control Manager role includes direct oversight and review of the entire documentation and physical inspection phase of the work flow process and working with other in-house personnel (e.g.: Project Managers, Project Engineers, etc.) and ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.60 LPA TO 1.80 LPA
Job Description
Ensuring the quality of product is consistent with the companyÂ’s policy requirement & is in accordance with applicable standards & clientÂ’s specification.
Daily ensures the 3rd party inspections & certifications as per customer requirement for RM, WIP, & FG etc.
Process Audits and Checks (Internal Quality Audit).
Initiating new product development and ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Job Summary
Responsible for execution of projects with good profit margins.
Key Accountabilities
Project Management, Planning, Monitoring & Execution
Listing down and managing the resource needs for projects, after considering the budgetary parameters set.
Establishing time span of project execution as per project specifics.
Monitoring project status during the course of periodic project review meetings.
Evaluating ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
Job Responsibilities:
Manage the Electrical works for the successful implementation of the project and after completion of project etc.
Co-ordination with Site and EPC Contractor for resolution of design and engineering interfaces, ensure timely works execution and as per required quality and standards
Study and review of Engineering documents and drawings of Electrical ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
3.00 LPA TO 4.32 LPA
Makes sales contacts, researches customer needs and develops sales targets for products and services working closely with Company principals.
Develops and delivers sales presentations and closes sales.
Participates in sales forecasting and planning.
Participates (with and under guidance of Principal) in the development of new products, modification of existing products and termination of ...
2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 2.50 LPA
Job Details
Key responsibilities would include:
Responsibilities as Site Engineer:
Study the BOQ in detail before starting any activity.
Prepare and monitor the checklist for every activity executed at project site.
Study the Tender and Contract Documents with all the terms and conditions.
Arrangement of manpower for projects and ensure optimal and effective use of the ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
Not Disclosed by Recruiter
Job Description: The role would be required to manage complete civil site projects from strategic conceptualisation to execution.Key Responsibilities: • Before starting a new project (site), survey the site for the risk involved, prepare a risk analysis report and safety requirements for executing a particular work, and submit to the ...
1 Opening(s)
8.0 Year(s) To 20.0 Year(s)
6.00 LPA TO 12.00 LPA
ABOUT THE ROLE
We are looking for an experienced and detail-oriented Project Engineer – Civil to lead day-to-day execution at our prestigious South Mumbai construction site. This is a high-visibility, on-site role responsible for ensuring that all civil works progress on schedule, conform to approved drawings and specifications, and meet the ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.20 LPA TO 6.00 LPA
Role of a Quantity Surveyor (QS) at work
Before starting any construction project, the quantity surveyor analyzes the drawing and specifications of the new building that architects or engineers provide.
The surveyors calculate the quantity of the material used in the building. Also, they must calculate the actual work or labor cost.
Quantity ...