1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 20.00 LPA
Position: Utility Head
Location: Sachin- Surat
Experience: 15- 20 Years
Industries: Chemical
Responsibilities:
Controlling and Maintaining Schedule of checklist of: (Chilling Plant, Boiler, Thermotank, Compressor, Cooling tower, RO plant)
Chilling Plant of All Units (GAS, Oil level, AMC etc.)
AMC Coordination with utilities with its applicability and Its paperwork.
Identifying ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 3.00 LPA
Job description
Should be perfect in welding/ fitting/ alignment as welder/Fitter.Fitting for utility equipment like compressor, cooling tower, DG Set, Blower, Heat Exchanger, Material handling equipment.
Required Candidate profile
Candidate Should have at least 5 years of experience in fitter and have worked as foreman.
Job description
Should be perfect in welding/ fitting/ alignment as ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
17.00 LPA TO 18.00 LPA
Position: Sr. Manager - Maintenance
Location: Vapi
Experience: 15 – 18 Years
Industries: Chemical
Responsibilities:
Manage the maintenance department that provides technical, project management, emergency response, trouble shooting and preventative maintenance support for process related equipment.
Develop, maintain, and justify the departments ...
2 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.00 LPA TO 2.40 LPA
Position: Maintenance Fitter
Location: Degam near by vapi
Experience: 1 - 2 Years
Industries: Plastic
Responsibilities:
To manage day to day maintenance of the plant.
Fault finding of all mechanically performed Equipment’s.
Preventive & Breakdown Maintenance of all utility & process equipment’s to be carried out & recoded as ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
Description:
Candidate must have sound knowledge of turbine field operation with 3 – 4 years of experience for Diploma Holders or 5 – 8 years for ITI Holders.
Urgent Requirement of Turbine Field Operator (2*25 MW Power Plant CFBC Boiler) at Pathapalayam Village,Gummidipoondi (Tamil Nadu) Location.
Experience in steam and gas turbine too will be preferred Should be ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 13.00 LPA
Duties and Responsibilities:
Performs maintenance management by supervising maintenance personnel and establishing priorities in maintenance schedules.
Maintains manufacturing assets and facility, parts inventory, monitoring purchase orders and manages the department budget.
Knowledge of Utilities i.e Crane, Gearbox, Pump, Hydraulic power pack, Cooling Tower, furnace roller hearth, Boiler, Compressor Etc…
...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 5.00 LPA
1. Participate in the formulation of engineering proposal, and evaluate the engineering proposal.
2. Solve important and difficult problems in HVAC equipment & other maintenance.
3. Organize and update equipment operation of utility equipment's.
4. Be mainly responsible for technical training related to HVAC Equipment's like screw & centrifugal chiller , Brine ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.00 LPA TO 3.60 LPA
Ass. Engineer - block mill manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, pallet area, coil forming area. ,garret, funnel line, pinch roll, coiler, walking ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.60 LPA
Working in hydraulic department. Maintenance lubrication system gear box lubrication.
maintenance of mill, shift handling as shift incharg manpower handling, mechanical Responsible for breakdown & preventive maintenance etc.
mechanical maintenance of mill, &equipments like ejector ,blowers, furnace, pullout roller, roller table, stands, pendulum shear, rotary shear, loppers ,water box, laying head ,conveyor, ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
9.00 LPA TO 10.00 LPA
Candidate should have min. 10-12 years of relevant post qualification experience of Power Based combined cycle co-generation
powerplant
& utility. He must have experience of Maintenance and trouble shooting in Gas Turbine , Process Steam Boiler/ Turbine & HRSG operation of 39MW and above capacity of each unit and, Cooling tower and auxiliaries.He ...