1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Key Responsibilities:Quality Assurance & Control: Oversee quality control activities in the Enamelling section for copper and aluminiumwires, strips, and CTC. Ensure compliance with customer specifications, national/international standards(IEC, IS, NEMA, ASTM, etc.), and internal quality norms. Monitor and verify raw material, in-process, and finished goods quality. Conduct coating thickness, adhesion, flexibility, ...
2 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.80 LPA TO 6.00 LPA
Objective:The Tile Supervisor is responsible for supervising and coordinating the activities of workers engaged in the installation of tiles (ceramic, vitrified, granite, marble, etc.) on floors, walls, and other surfaces to ensure quality, safety, and timely completion of the work.
Key Responsibilities:Supervision and Execution
Supervise tile laying teams and ensure proper work allocation.
Verify ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
0.00 LPA TO 4.00 LPA
Job Title: Production Supervisor – FRP & SMC Division
Location: Jhajjar, Haryana
Department: Production
Reporting To: Production Manager / Plant Head
No. of Positions: 4
Salary: ₹30,000 – ₹35,000 per month
Benefits:
• Medical Insurance
• In-House Meal Facility
• Provident Fund (PF)
Company Overview
Dudhi Industries Pvt. Ltd. is a leading manufacturer of advanced composite products including FRP Pultruded Profiles, ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 9.00 LPA
Job description
Job description
We are Hiring for Production and Maintenance Engineers for Pre-cured Tread Rubber Manufacturing
5 to 10 Years Experience 2 to 4 years in the production and Maintenance of Tyre retread units or any tyre industry.
Job Description
1. Should have experience in the Precured Tread Rubber manufacturing process.
2. Responsible for Production output at all production machines ...
4 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.50 LPA TO 1.80 LPA
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Description:
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before Concreting9. ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Hi
PFB:
Look after the inventory control of the spares, which are required for the machine.
* worked on process and product layout of the plant.
* Welding and gas cutting works,
* Look after the maintenance of the machine and tools.
* Expose to work on R&D activities. and Handling all kinds ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 8.00 LPA
Job Description
Description:
The Sr. Civil Engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Description:
The site engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
The Sr. Civil Engineer roles and responsibilities on construction site,1. Interpretation of Drawing2. Preparing Bar Bending Schedule3. Allotting Work to Labors4. Supervision of Construction Work5. Preparing Schedule of Material Used and Available6. Plotting Line – Level on Construction Site7. Preparing Work Chart Schedule8. Checking Steel Work of Slab, Beam, & Column Before ...