1 Opening(s)
6.0 Year(s) To 9.0 Year(s)
8.00 LPA TO 10.00 LPA
Technical Skills: MS Office, AutoCAD, Solid Works, Auto Desk, PVelite, HTRI Overall more than 6 years of experience in Estimation, Design and Fabrication of Process Equipment including Pressure Vessel, Heat Exchanger, Columns, Reactors, Dryers, Hoppers, Ladles, Ducting, Tanks, Material handling equipment’s, Process Skids and Pipelines, Industrial Air Filters, and Burners
Specialise ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 6.50 LPA
Hand on experience on Plant machinery maintenance .
Sound knowledge on Preventive Maintenance, Corrective Maintenance and Shutdown Activities.
Maintenance works for various Mechanical rotating and static equipment’s like Air compressor, Air Dryer, Cooling Tower etc.
Maintenance work of Pumps, Blower, Agitator, Heat exchanger, Valves, Vessels, Steam & pipelines of Metallic and Non-Metallic MOC.
Compressor, ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Hand on experience on Plant machinery maintenance .
Sound knowledge on Preventive Maintenance, Corrective Maintenance and Shutdown Activities.
Maintenance works for various Mechanical rotating and static equipment’s like Air compressor, Air Dryer, Cooling Tower etc.
Maintenance work of Pumps, Blower, Agitator, Heat exchanger, Valves, Vessels, Steam & pipelines of Metallic and Non-Metallic MOC.
Compressor, ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 13.00 LPA
Job Description:
CAPEX pproposal and designing of brown and green field projects.
Preparing Basic Engineering Package consisting design basis document, material balance, energy balance, Utility calculations, development of Process Flow Diagrams.
Development of P&IDs and layout.
Preparing process datasheet for equipment’s like batch reactors, agitators, vessel, ANF, RVD, pumps, heat exchanger, storage tanks etc.
Technical reviewing of GA ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 4.00 LPA
-Having ASNT Level-II at least in DPT and RT.-Having details knowledge for pressure vessel, heat exchanger, Various skids etc. equipment’s.-Having enough knowledge for construction code as per EN and ASME.-Certification knowledge and having participate for Audit of U-Stamp, CE marking and ISO- 9001.-Production step wise knowledge and Inspection methodology like ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
The job description is as below:
Preparing Room Layout for Pre & Post orders.
Preparing P&ID and General arrangements Drawings for Pre & Post orders.
Preparing and leading design reviews for Long Lead items.
Preparing 3D Model in Software.
Preparing Bill of Material in ERP System for Production and Purchase team.
Cooperation with Clients for technical ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 3.00 LPA
Job description
Should be perfect in welding/ fitting/ alignment as welder/Fitter.Fitting for utility equipment like compressor, cooling tower, DG Set, Blower, Heat Exchanger, Material handling equipment.
Required Candidate profile
Candidate Should have at least 5 years of experience in fitter and have worked as foreman.
Job description
Should be perfect in welding/ fitting/ alignment as ...
2 Opening(s)
1.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Design and develop finned tubes as per customer and technical requirements
Qualification: Diploma / B.E. Mechanical
Coordinate with workers and the management team to improve productivity.
Experience: 2 to 3 Years Experience inheat exchanger / fin tube manufacturing industry
Support fin tube manufacturing operations on the shop floor
Vacancy: 1
Maintain stock records and manage inventory entries in ERP.
Basic knowledge of ...
1 Opening(s)
7.0 Year(s) To 9.0 Year(s)
7.00 LPA TO 9.00 LPA
JD of Production Manager
Supervising daily production operations and shop floor activitiesEnsuring production targets, quality standards, and timelines are met.Coordinate corrective and preventive maintenance activities for Fin Press and Hairpin Bendingmachines in collaboration with the maintenance team; support root cause analysis andimplementation of permanent countermeasures.Manage Heat Exchanger / Coil Shop line ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Preparation and allotment of daily productions plans
Preparations of manufacturing plan
Ensuring procedures are carried out safely.
Study of drawings and fabrications of columns, tanks, vessels, heat exchangers, piping’s, skids, systems as per various
Co – ordination with quality department for shop inspections, NDT completions material clearances etc.
Co – ordinations with, Purchase, Planning, Quality, ...