41 Job openings found

1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit. Work as per the guideline of TPM/TS Development and mfg. jig and fixture and establishment for production  Decided optimum cycle time for hydraulic and pneumatic testing Co-Ordinate with PPC department for smooth production running Set the robotic line as per the targets and balance the bottle neck operation Overcome all the minor abnormality related to fixture during trial.  Set the TPM target for quality, maintenance, stores and production.  Arrange for all resources including raw materials, man power and facility required. Handling overall press shop production for daily production targets Overall responsibility of welding sub assembly of floor board and running board assembly PROCESS follows with safety and through with safety and work permits.  Achieving the planned targets without Compromising the quality and quantity Working as per various standards like ISO9001&Tsi6949-2002 system Preparation of daily & Monthly reports Co-Coordinating with Stores, QC, QA, Maint .In day to day activity Awareness of seven QC tools to improve quality problems Handling 4M for achieve desired production targets Job Location : Waluj MIDC Aurangabad For more details call on 9765567509

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile