1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.40 LPA TO 3.60 LPA
Planning and effecting predictive & preventive maintenance schedules for various equipment to increase machine uptime & equipment reliability.
Preventive / Predictive / Breakdown maintenance of EOT cranes , pump, blowers, AC/DC Motors, LT/HT Motors, material handling equipments , Air Compressors , D.G. Set , Electrical Wiring , Troubleshooting ,Cable Routing , ...
3 Opening(s)
2.5 Year(s) To 3.5 Year(s)
5.00 LPA TO 7.00 LPA
Role : Application Developer Role Description : Design, build and configure applications to meet business process and application requirements. Must have Skills : Enovia Good to Have Skills : No Technology Specialty Job Requirements : Key Responsibilities : 1 Guiding the team in development / customization using Enovia 2 Work ...
3 Opening(s)
0 To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
Post: Automation Engineer
Education : Diploma / BE Electrical or Electronics
Experience: Min 6 Month
Salary: up to 3.00 PLA
Job Profile / Skills:
•PLC Programming, HMI & SCADA graphics development and commissioning.
•BMS System.
•Designing of GA, SLD and electrical schemes in EPlan Electric P8 & AutoCAD Electric.
•Testing and commissioning of PLC, VFD, AMF, DG synchronizing, RTCC, PCC, APFC, MCC and IMCC Panels.
•Project related technical documentation.
•Leading the team for project execution
Job Location: Waluj MIDC, Aurangabad
Bus facility available
for more details call on 9765567509 / 9765567505
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
1.80 LPA TO 3.60 LPA
Post: Maintenance Engineer or Senior Engineer
1. Mechanical Maintenance Engineer 01
2. Electrical Maintenance Engineer 02
Experience: 2 to 7 Years
Salary: 3.60 LPA
JOB RESPONSIBILITIES:-
Attending all breakdowns of machines, Equipment & its Rectification
Handling & Maintenance of Air Compressor, Electrical Motors, Transformers, ACB
Maintenance of Forging machines(1T,2T,3T,5T,8T, LASCO Belt drop), Forging Press(400 Ton, 500 Ton, 600 Ton), Cutting m/c.
Handling breakdowns of Shot blasting m/c, Magnaflux m/c, Heavy Grinder, Heat Treatment Furnace (Oil & Induction), LT & Ht Panel.
Preventive Maintenance of all machines as per PM Schedule, Maintain history card & maintenance related data of Machine.
Control Panel wiring, Maintain unity P.f. of the plant.
Calculating MTTR, MTBF, Control the spares consumption.
Knowledge of MCC Panel, PCC Panel & APFC Panel, PLC, PNP sensors
Ensure availability of spare parts required for maintenance and raising PR
Induction Billet Heater [Ibh] Coils Connection
Robot Connectors And Working Trial
Hoists Maintenance
Replacing Faulty Limit Switches, Proxy PNP Sensors
During Servicing Of Transformers Set Up Work And Dg Sets
DM Water Plant, Cooling Towers
Motors Connections During Changing Motors
Heat Treatment Plant/Thermocouple
Taking Daily Readings Of Air Circuit Breaker, Vaccum Circuit Breaker, Ibh, Heat Treatment Plant And 33kv Ht Yard
Job Location: Waluj MIDC, Aurangabad
Send CV on Career@paradiseplacement.co.in
for more details call on 9765567505
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.40 LPA TO 3.60 LPA
Roll :
Designing various electrical control panels like PLC, VFD, Soft Starter, MCC, PCC, Pneumatic, ETC Circuit designing, preparing SLD, Panel layout & Electrical schematics.
Making BOM, selection of material as per requirement or IP protection, preparing drawings for approval communicating with clients for understanding and detailing of drawings
Supporting to other teams ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
Roll :
Designing various electrical control panels like PLC, VFD, Soft Starter, MCC, PCC, Pneumatic, ETC Circuit designing, preparing SLD, Panel layout & Electrical schematics.
Making BOM, selection of material as per requirement or IP protection, preparing drawings for approval communicating with clients for understanding and detailing of drawings
Supporting to other teams ...
1 Opening(s)
13.0 Year(s) To 20.0 Year(s)
10.80 LPA TO 12.00 LPA
Urgent Requirement of Electrical Head-Maintenance for SMS Division at Raipur Location.3
Operation of HT/LT Panels, switchgear, Transformer, MCC/PCC panel, Motors Starters, Timers.
Preventive and general Electrical maintenance as per schedule.
Parallel operation of alternators and their load sharing.
Designing, testing, wiring, servicing and commissioning of all type of control and power panel i.e. MCC, ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.40 LPA TO 2.40 LPA
JOB DESCRIPTION
Involvement in testing and commissioning of transformer
Good knowledge of electrical drawings
Knowledge of circuit breaker,PCC & MCC Panels
Worked as a site engineer for maintenance of construction power supply & erection.
Knowledge of cable schedule & cable termination.
Basic knowledge of civil drawing of Electrical Panel, Electrical Instrumentation & Electrical equipment for foundation ...
5 Opening(s)
3.0 Year(s) To 12.0 Year(s)
3.00 LPA TO 30.00 LPA
Essential Job Duties:
Performs electrical discipline work which involves the preparation, interpretation or review of calculations, specifications, electrical layout plans including lighting and grounding systems.
Participates in one or more of the following:
ETAP/Smart Plant Electrical (SPEL)
Equipment design and development
System design, including concept sketches and layouts
Preparation of specifications and design calculations
Reviewing and ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
JOB DESCRIPTION
Involvement in testing and commissioning of transformer
Good knowledge of electrical drawings
Knowledge of circuit breaker,PCC & MCC Panels
Worked as a site engineer for maintenance of construction power supply & erection.
Knowledge of cable schedule & cable termination.
Basic knowledge of civil drawing of Electrical Panel, Electrical Instrumentation & Electrical equipment for foundation ...