3 Opening(s)
3.5 Year(s) To 5.5 Year(s)
6.00 LPA TO 10.00 LPA
Role : Application Developer Role Description : Design, build and configure applications to meet business process and application requirements. ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic / Electrical / Mechanical
Gender: Male
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as an associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase, Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Shendra MIDC, Aurangabad
for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic
Gender: Female
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase , Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Chitegaon MIDC , Aurangabad
for more details call on 7249840222
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.20 LPA
Job Description:
Post: Sr. Engineer - QA
Education: BE/ Dip (Mech)
Keywords: Press shop department experience candidates should be preferred
Job Profile
HAndle Customercomplaints and knowledge about IPO, PPAP, SPC, and ISO Audit.
Conducting Process Audit, Product Audit, Supplier Audit as per plan.
Monitoring & reviewing the SPC study, process FMEA and MSA study on monthly basis.
Control of documents and records as stipulated in quality system procedures includes the issue of controlled copies.
Monitoring In-Ward & Final Inspection.
1st piece in process inspection report & taking C.A. if any.
In handling customer complaints and their solutions.
To maintaining quality related document calibration report, Inspection report and etc.
To take follow up on supplier corrective action reports.
Preparing the control plan of In-Ward, Final& In-Process component.
Preparing PPAP, PFMEA for new development components
Do SPC to check process capability.
Vendor Audit & internal audit and online production inspection.
Handling Quality team for in-process inspection.
Prepare Monthly data for MRM. ï‚· ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 2.40 LPA
Post: QA Engineer In Process/ Inward
Education: BE/ Dip (Mech)
Experience: 1-4 years
Keywords: Fabrication department experience candidates should be preferred
Job Profile
Conducting Process Audit, Product Audit, Supplier Audit as per plan.
Monitoring & reviewing the SPC study, process FMEA and MSA study on monthly basis.
Control of documents and records as stipulated in quality system procedures includes the issue of controlled copies.
Monitoring In-Ward & Final Inspection.
1st piece in process inspection report & taking C.A. if any.
In handling customer complaints and their solutions.
To maintaining quality related document calibration report, Inspection report and etc.
To take follow up on supplier corrective action reports.
Preparing the control plan of In-Ward, Final& In-Process component.
Preparing PPAP, PFMEA for new development components
Do SPC to check process capability.
Vendor Audit & internal audit and online production inspection.
Handling Quality team for in-process inspection.
Prepare Monthly data for MRM. ï‚· Involvement in new machine trail & commissioning.
Making SIR ...
7 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 3.00 LPA
Post :
QA Engineer In Process - 04
QA Engineer Inward - 03
Education: BE/ Dip (Mech)
Experience: 2-4 years
Keywords: Fabrication / Weld Shop department experience candidates should be preferred
Job Profile
QA Engineer Inward
Conducting Process Audit, Product Audit, Supplier Audit as per plan.
Monitoring & reviewing the SPC study, process FMEA and MSA study on monthly basis.
Control of documents and records as stipulated in quality system procedures includes the issue of controlled copies.
Monitoring In-Ward & Final Inspection.
1st piece in process inspection report & taking C.A. if any.
In handling customer complaints and their solutions.
To maintaining quality related document calibration report, Inspection report and etc.
To take follow up on supplier corrective action reports.
Preparing the control plan of In-Ward, Final& In-Process component.
Preparing PPAP, PFMEA for new development components
QA Engineer In Process
Monitoring of special processes (Welding).
Monitor & Handle Customer feedbacks & complaints.
Handle all type of gauges and ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.68 LPA TO 2.16 LPA
Monthly MRM Presentation with material cost indices/price trends & other required factor.
Handling all the requirment of casting machining Dept.like cutting tools/packging material and consumble at BPTL
Regular Written & in-perosnal communication with Management/HOD’s
Interview,Identify & Qualify new suppliers in order to secure more cost effective sources of products & services.
Monitoring Supplier performance ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.50 LPA TO 4.00 LPA
Summary Job Responsibilities : Purchase officer
Outsourcing of maching parts for job work.
Monthly MRM Presentation with material cost indices/price trends & other required factor.
Handling all the requirment of casting machining Dept.like cutting tools/packging material and consumble at BPTL
Regular Written & in-perosnal communication with Management/HOD’s
Interview,Identify & Qualify new suppliers in order ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 5.00 LPA
Installation, Testing, Commissioning, Maintenance & Troubleshooting-
Preventive, Predictive, Target Base and Break down Maintenance planning and activities.
Responsible for Power Saving Jobs, Projects, Modification Works.
Adhere to POKA-YOKE, 5S, documentation.
Carrying out Why-Why/Root-Cause/Break Down analysis.
Attending breakdown related machine in high voltage & low voltage power cable industry such as VCV line, RBD, 91 Bobbin ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.00 LPA
Position: Procurement Engineer (Saykha)
Location: Saykha near by Bharuch
Experience: 3 -4 Years
Industries: Chemical
Responsibilities:
Executing the tendering process from vendor /contractor evaluation, floating bids, bid evaluation, techno-commercial meeting, negotiation, Preparing & awarding the Order or Contract.
Complete procurement to pay Cycle for all category of items / Services.
Project ...