1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
50.00 LPA TO 55.00 LPA
Proposal Engineering
Decide on Plant configuration of upcoming Projects.
Review Generation Yield Estimates
Evaluate New technologies.
Prepare optimal BOM’s for cost estimate
Retrofit Engg existing Plants
Site Evaluations
Tender Engineering
Module related Engg support to Procurement.
Generate Solar specific detailed tender documents
Review and Evaluate Bids to prepare
Detailed Engineering
Conclude detailed engg of awarded packages in time.
Resource planning and optimization to ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
5.00 LPA TO 9.00 LPA
Dy MANAGER/MANAGER-ROLLING MILL(MAINTENANCE & PRODUCTION) for Reputed Steel plant at jharsuguda location
Steel plant configuration:-sponge iron 100*8 tpd,furnace-20*4 ton,TMT -2 lac tpa,power plant-70 mw,Blast Furnace-250 meter, Ferrous Alloys - 15*2MVA
Maintain daily checklist for the rolling mill equipment for smooth production.Implementation of preventive maintenance for daily production Attending critical breakdown to reduce ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
28.00 LPA TO 28.00 LPA
Job Description for Wind Resource and Performance analysis Role
1. Operational WTG Assets
a. AEP assessment for as built plant configuration,b. Wake effects, environmental effects and their impacts on wind generation performance.c. WTG performance analytics of operational plants.
2. Support in O and M generation budget preparation.
Preparation of DPRs for wind and hybrid projects for ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
28.00 LPA TO 28.00 LPA
Job Description for Wind Resource and Performance analysis Role
1. Operational WTG Assets
a. AEP assessment for as built plant configuration,b. Wake effects, environmental effects and their impacts on wind generation performance.c. WTG performance analytics of operational plants.
2. Support in O and M generation budget preparation.
Preparation of DPRs for wind and hybrid projects for ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
28.00 LPA TO 28.00 LPA
Job Description Solar Resource and Performance analysis Role Proposal Stage Yield Assessment
a. Solar Resource Assessment covering comparison with nearby plants, aerosol/pollution study and climate studyb. Energy yield assessment for solar projects and solar part in hybrid projectsc. TL line loss assessment, Tilt-Pitch analysis, Tracker Vs Fixed Tilt analysisd. Maintaining the Solar resource database ...
1 Opening(s)
25.0 Year(s) To 30.0 Year(s)
30.00 LPA TO 36.00 LPA
STEEL PLANT CONFIGURATION-SPONGE IRON 100*8,FURNACE - 20*4 TON,TMT -2 LAC TPA,POWER PLANT-70 MW,BLAST FURNACE-250 METER,FERROUS ALLOYS-15*2MVACALL FOR 0771 4268132/9009777337
The Details of present Services are as follows :
Over all responsible for production,maintenance,quality Control and planning of Pellet Plant ,sponge iron plant ,SMS,Power Plant and rolling mill as per targe
Over all responsible ...