1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 13.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
14.00 LPA TO 20.00 LPA
Job Title: AM/ DM – Contract Management, Renewables
Department: Procurement (Contract Management) Reporting: Contract Management Lead Location: Worli, Mumbai Experience: 4 to 7 years of experience Budget: 14-20 LPA (Includes variable 10%)
Key Purpose of the Role:
To independently handle contract drafting, negotiation, and finalization for Solar, Wind, and Hybrid projects, while ensuring ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
80.00 LPA TO 90.00 LPA
Job Description: Project Head – Renewable Energy (Wind & Solar)Position: Project Head / Head of Project Management (Wind & Solar)Reports to: Chief Project Officer (CPO)Type: Full-time
Job Purpose
The Project Head will lead the end-to-end execution of large-scale, utility-scale wind and solar projects, ensuring timely delivery within budget and high Quality, Health, ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.50 LPA
Roles & Responsibilities :
Set up the SOP for site survey and design. Supervise the work of the design engineer for accuracy, and optimization of design as per site survey conducted.
Ensure BoM is designed to maximize cost-benefit to achieve while keeping losses at a minimum.
Conduct site surveys before plant design and ...
2 Opening(s)
8.0 Year(s) To 16.0 Year(s)
20.00 LPA TO 25.00 LPA
Job Responsibilities: Primary responsibilities:Collection:? Analyse range architecture /PPA (Price Point Analysis)/competition.? To build collection in collaboration with sourcing/collection dept to as per market trend and requirement.? Decide the launch period of the new concepts/range as per the seasonality.? Visit sourcing partners & own units for new sample developments along with ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
24.00 LPA TO 30.00 LPA
Responsibilities 1: Should be able to handle activities like plant monitoring, efficiency, fuel management, manpower planning, PPA compliance, coordination with electricity authorities for load, good relations at load dispatch, emergency handling, etc. Should be aware about transmission network, power evacuation, basics of power trading, open access power, etc.Responsibilities 2: Should ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
24.00 LPA TO 30.00 LPA
Responsibilities 1: Should be able to handle activities like plant monitoring, efficiency, fuel management, manpower planning, PPA compliance, coordination with electricity authorities for load, good relations at load dispatch, emergency handling, etc. Should be aware about transmission network, power evacuation, basics of power trading, open access power, etc.Responsibilities 2: Should ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
24.00 LPA TO 30.00 LPA
Responsibilities 1: Should be able to handle activities like plant monitoring, efficiency, fuel management, manpower planning, PPA compliance, coordination with electricity authorities for load, good relations at load dispatch, emergency handling, etc. Should be aware about transmission network, power evacuation, basics of power trading, open access power, etc.Responsibilities 2: Should ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 15.00 LPA
Able to handle local issues properly
He should have experience of handling atleast 70 MW independently
Should have Solar Ground Mounted Exposure of min 10 Years through out.
Should have experience in Solar Tracker
Sungrow inverter
Solar O&M gound mounted experience should be 10 yrs
We need stability no frequent change
Unit SOLAR ...
1 Opening(s)
13.0 Year(s) To 16.0 Year(s)
20.00 LPA TO 25.00 LPA
Business Solar business
1) Job Purpose: Write the purpose for which the job exists
The Solar Power Plant Manager is responsible for maximizing revenue generation and minimizing operational losses and costs by overseeing efficient Operation & Maintenance and Asset Management ofthe Solar power plant. This role ensures regulatory compliance and smooth coordination with ...