1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
Responsible for all over Electrical in steel melting shop. Experience : 8 year and above Qualification : B.E. - Electrical, B. Tech. -Electrical Skill : Having knowledge Panel, Crane maintenance, Induction furnace Maintenance etc.
Responsible for Manufacturing of mild steel Billets.
Responsible for overall plant ( SMS Section)-Electrical plant machinery attend break down ...
1 Opening(s)
12.0 Year(s) To 14.0 Year(s)
6.00 LPA TO 7.00 LPA
Urgent Requirement AGM E&I-AGM E&I-SID For 350 tpd & 500 tpd Reputed Steel plant At RAIPUR location for Selecting control schemes, identifying appropriate system, handling enquiry specifications and selecting instruments as per type of application; managing the process instrumentation to optimise productivity; Used Emerson’s/Rosemount/Honeywell/Siemens etc. Make
Understanding the technical & functional specifications.Executing predictive ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
We are looking for Electrical HEAD for 8MW Power Plant at Bilaspur location.
"Lead and provide technical direction to the team and responsibility for efficient and reliable maintenance of Electrical systems.
Provide technical direction to trade/craft and engineers.
" Exposure of overhaul and general maintenance of following equipments / sub system of power ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 16.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
5.00 LPA TO 9.00 LPA
To prepare and implementation of preventive and predictive maintenanceProgram for various electric & electronic equipments of continuous castingMachine and versed with instruments like RTDs, Thermocuples, control valvesLimit switches,Pyrometers,flow meters etcCalibration & maintenance of digital temp. Recorders, display system flowmeter,PID controllers, pressure gauges etc. planning of capital spares for preventive maint.Of ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
5.00 LPA TO 9.00 LPA
Conducting regular tests to ensure the performance capacity of various equipments.
Effectuating predictive & preventive maintenance for enhancing reliability & increasing machine uptime.
Maintaining the whole of CCM machine.
Operation on CCM to cast Billet & Bloom Casting.
Erection and commisioning work of 6/11 mtr machine make concast india mumbai.
Operation on 6 / 11mtr ...