1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
4.00 LPA TO 6.00 LPA
Job Responsibilities.
Purchase Department
•Responsible for procurement of Raw Material 15B25,20MNCR5.EN8D, EN9 (Black bar)
•Handling forged & cast with machined components like cost finalization for same.
•Strategic decision making for new part & supplier development like SOB, alternative sourcing, stocking agreements etc.
•Development of new vendors for forged & cast for sub-contracting.
•Development of new parts.
•Experience in supplier auditing.
•Determining appropriate methods of procurement/subcontracting & performing a cost-benefit analysis.
•Supply chain management(Daily business)
•Monitoring & controlling purchasing as per budget.
•Preparation of cost sheet.
•Make efforts to establish reliable sources of supply goods & services for project procurement.
•Source improvement & process optimization thus aiming at cost reduction & savings.
•Planning & scheduling follow up & maintaining the smooth flow of all materials.
•Responsible for procurement of All Consumable Material (Shafts, Axles, Bushes, Gears, Pinions, Sleeves, Hubs, Sprockets, Aluminum PDC Parts).
•Responsible for procurement of All Tooling Material
•Handling 3000 items. With more than 350 vendors.
•Finalizing the rate & release purchase order(Raw Material, Consumable, Fixture, Gauges & Tooling).
•Issue of Purchase Order.
•Amendments Of Purchase Order(POAM)
•Vendor Master- Info Records, Source List, and Quota Arrangement.
•Routine activities of Purchase Department.
•Monthly Purchase Budget Planning
•Procurement of Material as per Purchase Plan.
•Preparing consumption raw material sheet as per model wise.
•Rate Different (Debit & Credit) Note Processing.
•Getting on time delivery from suppliers and better inventory management
•Total bill passing for all material.
•Development of new vendors for forged & cast for sub-contracting.
•Product costing, vendor payment, supply schedule, release of purchase order
•Co-ordination with vendors & team work.
•Involved in all audits functions like QMS,EHS,OSHAS,SAFETY,INVENTORY STOCK.
Supplier Relationship Management
•Controlling supplier performance by rating system & regular assessments.
•Resolving contractual disagreements with suppliers & escalating as & when required.
•Resolve quality issues through development of quality measurements.
•Developing & managing effective with other internal departments
Job Location: Waluj MIDC, Aurangabad
Send CV on Career@paradiseplacement.co.in
for more details call on 9765567506/505
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 10.00 LPA
Personnel & Administration
Managing recruitment for sourcing as per manpower requirement through Job portals like Naukri, Monster india, Times job, Placement Consultant, Employee Referrals And Various Government employment and training schemes like EPP, Apprentice, etc.
Conducting preliminary Interviews, tackling and co-ordinating Walk-ins.
Identifying candidates as per the requirements, scheduling interviews and verifying candidate’s ...
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Personnel & Administration
Managing recruitment for sourcing as per manpower requirement through Job portals like Naukri, Monster india, Times job, Placement Consultant, Employee Referrals And Various Government employment and training schemes like EPP, Apprentice, etc.
Conducting preliminary Interviews, tackling and co-ordinating Walk-ins.
Identifying candidates as per the requirements, scheduling interviews and verifying ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.00 LPA
Qualification : Diploma / BE ( Civil )Experience : 2 to 5 Year
Salary : 20 to 25 k Job Profile:Review of bills of quantities and item lists. Value engineering to achieve functionality, safety, speed of execution and quality at lower costs by evaluation of different options. Checking and certification of ...
2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
4.00 LPA TO 4.50 LPA
Forklift Operator Responsibilities
Include:
Unloading materials and merchandise from incoming vehicles and stacking them to assigned places
Locating and moving stock of products to pallets or crates for storage or shipment
Identifying damages and report shortages or quality deficiencies
Job brief
We are looking for a careful forklift operator to move packages and material around our facilities. ...
1 Opening(s)
6.0 Year(s) To 15.0 Year(s)
3.60 LPA TO 4.20 LPA
Hiring for Production Manager in AhmednagarCompany Profile: was started in 1991 with one power press serving with pressed components in a 1500 sq. feet. press shop in Ahmednagar, Maharashtra.
Gradually the company expanded its customer base to include Electrical Switch gear industries.
It was in the year 2004, that the company ...
8 Opening(s)
2.0 Year(s) To 10.0 Year(s)
1.80 LPA TO 2.40 LPA
Requirements
ITI/Diploma from reputed organization
2-6 years of Proven experience as welder in welding
Experience using a variety of welding equipment and procedures (MIG & TIG .)
Experience in using electrical or manual tools (saws, squares, calipers etc.)
Ability to read and interpret technical documents and drawings
Knowledge of relative safety standards and willingness to use protective clothing ...
15 Opening(s)
0 To 4.0 Year(s)
1.20 LPA TO 1.80 LPA
Requirements
ITI/Diploma from reputed organization
0-2 years of Proven experience as welder in welding of structural steel
Experience using a variety of welding equipment and procedures (MIG, MMA etc.)
Experience in using electrical or manual tools (saws, squares, calipers etc.)
Ability to read and interpret technical documents and drawings
Knowledge of relative safety standards and willingness ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
12.00 LPA TO 15.00 LPA
PROFESSIONAL PROFILE: -
Management of all activities within the Machine Shop and all other related operations of the company.
Plan & schedule all shop activities for timely completion of customer req.
Conducting daily production meeting and Co-ordination among various departments for timely completion of production schedules.
Conceptualize and implement strict measures in operating procedures and equipments to optimize resource – Man, Machine, Method, Material /Capacity utilization.
Providing strong leadership to the employees at the plants, ensuring high morale, team work and good employee relations at all levels.
Working on Process bottlenecks, plan B & plan C to improve the plant performance
Effective implementation of systems are of 5S, TPM-JH,KK,QM,PM, Safety, SOP’s, DMR, SAP, ISO/TS 16949, etc.
Actions, analyse & monitor for non conformance by root cause analysis & elimination through ABC analysis, why-why (6W2H), fault tree analysis and various QC tools.
Active participation in developing the new components for process selection, process parameters, selection of tool & tooling’s w.r.t. quality & customer requirements.
Process & manufacturing cost reduction by analysis & actions on losses, wastages(MUDAS), improvement in Takt time & implementing the concepts of Lean, TPM, Kaizen, Pokayoke, 5S, Single piece flow, Automation, etc.
Establish implement and maintain quality system and other documentation required as per ISO/TS 16949.
Lead the implementation of new manufacturing initiatives, including strategic resource allocation and applying good manufacturing principles, organization structure, leadership, sourcing and integration, production systems and techniques for improved efficiencies and adherence to best practice.
New Product Development /Vendor Up gradation in line of new business development for the Organization.
Monitor and improve the results, goal setting & improvements by PQCDSM.
Small group activities - instrumental in promotion of small group activities like problem solving, continuous improvement, Mistake proofing, safety, productivity improvement, TPM and circle teams.
Implementing the concepts of “Visual Shop Floor” by 5S, with complete change in “Before & After” conditions by PQCDSM & DMR.
FUNCTIONAL STRENGTHS: -
Production Management & OptimizationStrategic Planning
Process up gradation & Cost ReductionTechnical analytic & background
Quality Management & System up gradation
Production Planning & ControlBottlenecks analysis & Actions to remove
New Product Implementation Gear Cutting – Hobbing, Shaping, Shaving & Machining
MACHINES INCLUDED: -
Hobbing Machines: Conventional & CNC (Liebherr, Mitsubishi, Pfauter, Gleason)
Shaping Machines: Conventional & CNC (Internal & External, WS1, Lorenz, etc).
Shaving Machines: Conventional & CNC (Sicmat, Hurth, Redring, Nachi, Mitsubishi)
ID Honing Machines: Horizontal & Vertical (Nagel)
Gear Tooth Chamfering Machines
CNC Turning, F & C, VMC, Hard Turning – Mild Steel & Castings
Grinding machines: ID and OD
Laser Marking machine
Gear Testing Instruments
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit.
Work as per the guideline of TPM/TS
Development and mfg. jig and fixture and establishment for production
Decided optimum cycle time for hydraulic and pneumatic testing
Co-Ordinate with PPC department for smooth production running
Set the robotic line as per the targets and balance the bottle neck operation
Overcome all the minor abnormality related to fixture during trial.
Set the TPM target for quality, maintenance, stores and production.
Arrange for all resources including raw materials, man power and facility required.
Handling overall press shop production for daily production targets
Overall responsibility of welding sub assembly of floor board and running board assembly
PROCESS follows with safety and through with safety and work permits.
Achieving the planned targets without Compromising the quality and quantity
Working as per various standards like ISO9001&Tsi6949-2002 system
Preparation of daily & Monthly reports
Co-Coordinating with Stores, QC, QA, Maint .In day to day activity
Awareness of seven QC tools to improve quality problems
Handling 4M for achieve desired production targets
Job Location : Waluj MIDC Aurangabad
For more details call on 9765567509