1 Opening(s)
0 To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 3.00 LPA
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
aintain tooling consumption, Quality Checking of all tool and equipment, Issues and entries of tool life monitoring.
maintain minimum stock of tooling , highlight if tool life not complied to norms.
daily report for tool stock.
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.00 LPA TO 4.00 LPA
ype of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of equipment maintenance,
repair work orders, and other activities
related to the operation of treatment facilities.
Daily reporting to Plant ...
1 Opening(s)
0 To 4.0 Year(s)
1.00 LPA TO 4.00 LPA
aintain tooling consumption, Quality Checking of all tool and equipment, Issues and entries of tool life monitoring.
maintain minimum stock of tooling , highlight if tool life not complied to norms.
daily report for tool stock.
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Location- MIDC Pimpri, Pune
JOB DESCRIPTION
Designation: - Fitter or Diploma Mechanical Engineer
Job Description:
Operation and Maintenance of all
type of pumps, blowers and other equipment
used in Sewage Treatment Plants.
Inspecting equipment to ensure that it is
working properly and efficiently.
Cleaning and repairing equipment
such as pumps, tanks, and pipes used
in wastewater treatment processes.
Maintaining records of ...
1 Opening(s)
10.0 Year(s) To 13.0 Year(s)
10.00 LPA TO 13.00 LPA
Responsibility :
Candidates should have experience of project management in water / waste water treatment, reverse osmosis, sewage treatment projects. Will be responsible for successful, timely & profitable execution & completion of EPC projects.
Analyzing and implementing the master schedule program. Finalization of Project Schedule, micro level planning. Familiar with planning on primavera and MS ...
1 Opening(s)
0 To 2.0 Year(s)
1.00 LPA TO 3.00 LPA
Design engineer with water. Effluent & Sewage treatment plant knowledge shall be able to perform the roles and responsibilities as below for tendering as well as detail engineering stage
Design and selection of Mechanical equipment i.e. Pumps, blowers, lifting equipments, penstocks, tanks, pressure vessels etc. and Piping components Pipes, fittings, Valves, strainers, specialities etc. for ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 4.00 LPA
Design engineer with water. Effluent & Sewage treatment plant knowledge shall be able to perform the roles and responsibilities as below for tendering as well as detail engineering stage
Design and selection of Mechanical equipment i.e. Pumps, blowers, lifting equipments, penstocks, tanks, pressure vessels etc. and Piping components Pipes, fittings, Valves, strainers, specialities etc. for ...
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
12.00 LPA TO 16.00 LPA
BE/ B.Tech - Environment with 10-12 years of experience
Must have handled Effluent Treatment Plant, Sewage Treatment Plant (ETP/STP) in big size Chemical, Petrochemical, Fertilizer or Refinery plants with Zero Liquid Discharge (ZLD).
Knowledge of Waste Water Treatment, Water Recycling, Reverse Osmosis (RO) as well as Pollution Control Board norms is required.
Trouble-shooting ...