1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
3.60 LPA TO 4.80 LPA
As a Purchase Executive, you will play a vital role in managing the procurement process for all solar products required for residential solar power plant projects. Reporting to the procurement manager, you will be responsible for sourcing suppliers, negotiating contracts, and ensuring timely delivery of high-quality products to meet project ...
1 Opening(s)
2.0 Year(s) To 8.0 Year(s)
10.00 LPA TO 10.80 LPA
Job Title: Design Engineer – Solar Power Projects Location: As required Reporting To: Technical Head / Project Lead 1. Role Objective To ensure all solar power plant designs are technically accurate, execution-ready, and compliant with applicable standards. The Design Engineer acts as a design validator and quantity checker, responsible for ...
1 Opening(s)
3.0 Year(s) To 12.0 Year(s)
4.00 LPA TO 6.00 LPA
1. Role Objective To ensure all solar power plant designs are technically accurate, execution-ready, and compliant with applicable standards. The Design Engineer acts as a design validator and quantity checker, responsible for reviewing vendor drawings, performing shading and yield analysis, verifying material quantities, and ensuring that every engineering decision supports ...
1 Opening(s)
6.0 Year(s) To 8.0 Year(s)
8.00 LPA TO 10.00 LPA
JOB TITLE : Safety Manager
YEARS OF EXP. : 6 to 8 years
QUALIFICATION : BE EEE
LOCATION : Chennai
CTC / Gross : 8 to 10 LPA
AGE / GENDER : Male
JOB DESCRIPTION
Safety Program Development & Implementation:
o Develop, implement, and maintain comprehensive safety policies and procedures to ensurecompliance with local, national, and international safety ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 9.00 LPA
A solar project manager maximizes efficiency in the implementation of detailed project plans, keeping track of goals, tasks, resources, schedules, costs, and contingencies. They are responsible for the quality of work, and for keeping a project on time and on budget. Solar installation managers identify opportunities to reduce costs and ...
1 Opening(s)
5.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 11.00 LPA
1. Should be experienced in design and engineering in Solar industry. 2. Should have a individual contributor, proactive, 3. Should have good hold in AutoCad, Google Sktech and PVsyst etc design softwares 4. Smart, Confident, team player"
KRA
Analysis of Site Survey ReportDetailed Bill of Material Preparation, Costing of solar power plantsElectricity ...
2 Opening(s)
5.0 Year(s) To 10.0 Year(s)
20.00 LPA TO 20.00 LPA
Essential Duties:
1. Site visit• Site Measurement: Roof detail measurement, cable route marking, termination point marking• Propose all component location to client.2. People co-ordination• Updating daily work to reporting manager3. Detailed Engineering• Detailed site visit report preparation• Understanding the OTM, Scope Matrix and KOM documents for the project• Preparation of shadow ...