470 Job openings found

10 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 6.00 LPA
Key Role & Responsibilities1. Set up production machinery.2. Mix and load raw materials into tanks.3. Read instruments and make adjustments to settings.4. Take samples and record data to monitor quality.5. Pack and store finished batches.6. Stock control.7. Clean and maintain machinery.8. Report problems.9. Recording information, such as ingredients, weights, and ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
4.00 LPA TO 5.00 LPA
Position:      Instrumentation Engineer  Location:      Vadodara Experience:   2 - 3 Years Industries:    FMCG Responsibilities: Schedule and undertake periodic maintenance on all Instruments. Ensure that equipment’s are in good working order so as to prevent disruption of activities. Shall have experience on Sensors, Transmitters, PLC, HMI, Etc. Shall be able to ready drawings P&ID, Panel drawings, ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
JOB PURPOSEThe Mechanical Technician – Operations & Maintenance will be responsiblefor round-the-clock operation, monitoring, maintenance, and troubleshootingof mechanical systems and equipment at the plant. The role supportscontinuous 24×7 operations by ensuring equipment reliability, safe workingconditions, and timely response to mechanical breakdowns to minimizedowntime and maintain plant performance.KEY RESPONSIBILITIES • Operate, monitor, ...
2 Opening(s)
7.0 Year(s) To 15.0 Year(s)
6.50 LPA TO 8.00 LPA
Key Role & Responsibilities1. Set up production machinery.2. Mix and load raw materials into tanks.3. Read instruments and make adjustments to settings.4. Take samples and record data to monitor quality.5. Pack and store finished batches.6. Stock control.7. Clean and maintain machinery.8. Report problems.9. Recording information, such as ingredients, weights, and ...
15 Opening(s)
4.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 8.00 LPA
Sampling of all raw materials, packing material, finished product as per their sampling plan. Testing of all raw materials, packaging materials, in-process products & finished products. HPLC/GC analysis of in process & FG & its documentation, as well as calibration of HPLCs/GCs and balance. Handling the head space analysis. Additionally, can perform ...
15 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 6.00 LPA
Sampling of all raw materials, packing material, finished product as per their sampling plan. Testing of all raw materials, packaging materials, in-process products & finished products. HPLC/GC analysis of in process & FG & its documentation, as well as calibration of HPLCs/GCs and balance. Handling the head space analysis. Additionally, can perform ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.16 LPA TO 2.40 LPA
  02.02.26 125474 HPS/2026/89 Yarn Godown incharge Male 1 2 to 3 BA/BCOM 10 Hours/9 to 7 PM A Yarn Godown Incharge manages all warehouse operations for raw or finished yarn, ensuring accurate inventory records, proper storage, and timely supply to production Key Responsibilities- Inventory Management: Maintain accurate records of incoming and outgoing yarn, conducting physical stock verification, and reconciling with system records (ERP/SAP). Material ...
2 Opening(s)
4.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 8.00 LPA
Sampling of all raw materials, packing material, finished product as per their sampling plan. Testing of all raw materials, packaging materials, in-process products & finished products. HPLC/GC analysis of in process & FG & its documentation, as well as calibration of HPLCs/GCs and balance. Handling the head space analysis. Additionally, can perform ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
18.00 LPA TO 22.00 LPA
A General Manager (GM) of Electrical & Instrumentation (E&I) in a Direct Reduced Iron (DRI) plant is a senior executive responsible for leading all E&I functions, from design and project execution to ongoing operations and maintenance, ensuring high plant availability, safety compliance, and efficiency.  Key responsibilities are typically divided into the following areas:   Operational ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
20.00 LPA TO 25.00 LPA
A GM for Ferro Alloys Production manages the entire plant, overseeing strategic planning, production efficiency (furnace ops, material flow), team leadership, quality control, safety, and P&L, ensuring optimal output of ferro-alloys like Silico/Ferro Manganese using high-temperature furnaces, while handling raw materials, inventory, and stakeholder relations for smooth, cost-effective operations.    Key Responsibilities: Strategic & ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile