258 Job openings found

1 Opening(s)
12.0 Year(s) To 25.0 Year(s)
10.00 LPA TO 18.00 LPA
Hiring for the upcoming plant in Beed MH of Manufacturing Edible Oils, Refineries, Coconut Oil Post: Plant Head Level: Manager / Senior Manager Job Profile: - Planning, organizing, directing and running optimum day-to-day operations to exceed customers- expectations - Increasing production, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality standards. Job ...
4 Opening(s)
2.0 Year(s) To 10.0 Year(s)
1.80 LPA TO 2.40 LPA
Post: Production Supervisor Vacant Post : 4 Nos. Interview Date:- 23 to 26 Dec 2018 Job Profile: Operating / programming of VMC, CNC, conventional machine maintain 5S Supervision and shift handling Implement 5s and kaizen related activities Improve cycle time for a no.of job in production Responsible for production norms & with Quality for every operation. Responsible for dept activities. Defining a ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic / Electrical / Mechanical   Gender: Male   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as an associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase, Store & account dept. for new material requirement •To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Shendra MIDC, Aurangabad   for more details call on 7249840222 / 9765567505
2 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.00 LPA
Post: Maintenance Engineer 3 Nos. Education: DME Experience: Min 3 Years Interview Date: - 24 to 29 Nov. 2018 Job Responsibility: Preventive maintenance and Breakdown Maintenance of All Machine Handling the maintenance (PM  & BM) of CNC & VMC,HMC Machine To do the maintenance of Leak Test Machines Working on POKAYOKE, KAIZEN activities To do the maintenance of SPM machine like drilling, Tapping, Reaming To do the Troubleshooting and Maintenance of PLC Doing necessary arrangements for the machine parts as per required situations Kaizen for Existing and old machines Followed 1S, 2S and TPM Process during working Maintenance for Utility section - Compressors, Electric reading, on a Monthly basis SAP related PM module PM Orders, Break down notifications, PR, service PR. Conducting periodic checks to ensure the performance of various equipment To make Breakdown Reports, PM Reports, Checksheet of Machine. To maintain the records as per (ISO) MTBF, MTTR Installation of a new machine.  Job Location: Waluj MIDC, Aurangabad Bus & Canteen facility not available For More details call on 9765567509 / 7249840222
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 5.00 LPA
Post: Senior Quality Engineer Educational Qualifications: Bachelor of Engineering in the stream of Mechanical / Production. Or Diploma in Engineering in the stream of Mechanical Salary: Up to 5.00 LPA Work Profile: Responsible for in process quality and final outgoing quality for swing arm, wheel rim with tyre assembly, Trailing arm, Handle Bar. Warranty sign off with analysis. IPO preparation ...
2 Opening(s)
4.0 Year(s) To 10.0 Year(s)
3.60 LPA TO 4.50 LPA
Looking for a challenging position, in the area of Press Shop & Fabrication where we can utilize your expertise and Experience in Production Company type: Mass manufacturing of engineering-intensive industrial products for automotive and other applications. Position - Senior Production Engineer Dept     - Production  Education - DME / BE Experience - Min 4 Years Required Skills- Must have experience in production activities in Spot Welding & Fabrication  Exposure in TPM, TS Salary: up ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.60 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)    Education: BE Electrical or Electronic   Gender: Female   Responsibilities & Authority: •Capacity Planning for production of particular Shop Floor •To Monitor & do the production planning according to the customer schedule •To Monitor the Raw Material availability as per planning  •To Monitor monthly & weakly production planning •To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan. •To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor •To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan. •To prepare the dispatch plan as per customer schedule. •To release the dispatch plan to production dept. •To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan •To release a kitting plan to the store's department in accordance with the production plan. •To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date. •To communicate with the design department about the output of process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production. •To maintain the record of the date and production order from which each change in engineering specifications is implemented in production. •To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.  •To release production orders in SAP as per plan and provide a cutting label for production. •To ensure timely confirmation of production in SAP. •To ensure that FG stocks in BSR coincide with that in SAP system. •To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on the daily basis •To ensure that packing of FG is done within shift time. •To ensure that daily production data update on display board and also update it in softcopy. •To Monitor & do measurement Of Production Objectives  •To Work in PP & MM module of SAP  •To Maintain the stock in SAP  •To Match the physical raw material stock & SAP stock  •Play an important role in WIP (STOCK) as coordinator for production & account dept. •Monitor Schedule Vs. Compliance of production •To take responsibility as associate member in KK pillar. •Monitoring Daily Attendance & data of operator, also co-ordinate with HR dept. for the same.  •OEE monitoring. •Plan v/s Actual monitoring. •Scrap monitoring. •Monitoring TPM activity of production department. •Monitoring ISO & TS activity of production department. •To coordinate with purchase , Store & account dept. for new material requirement •To communicate with supervisors & line leaders of respective section (ACC , LPC, ASSEMBLY) •To maintain KAIZEN & coordinate with QMS Dept. for the same •To prepare MRM Presentation •To make stage wise identification   Job Location: Chitegaon MIDC , Aurangabad   for more details call on 7249840222
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
250000.00 LPA TO 350000.00 LPA
Job Description   Designation Engineer - Automation. Purpose To Carry out Maintenance activities at Plant-7, Jigani. Reporting AM/DM - Maintenance. Age 23~ 28 Yrs.        Qualification Diploma/BE in Mechatronics/Electrical/Electronics/Mechanical   Experience   2-4 yrs. (min) in Manufacturing/Automotive/Automotive components Industry with Rich Experience in Factory Automation Preferably in Robots and Gantry.  Key Responsibilities   ·        PLC Programming and Machine Interfacing for Automations. ·        Maintaining Automation Breakdowns at minimum level. ·        Effective ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.40 LPA TO 3.00 LPA
Post: Logistic Executive Experience: Min 2 Years Salary: up to 3.00 LPA Job Profile : Logistic: Managing logistics functions, negotiating with transporters & C&F Agents for cost-effective transport solutions & their respective clearances Business Development planning, mapping, and Implementation Responsible for material inventory optimization Responsible for warehouse, stores area design according to the flow of the material from starting point to the consumption end Preparation of SOP’s for Operator Efficiency Solve Day-to-Day Issues using logistics tools Define Min-Max levels and maintain inventory Responsible for transport optimization according to the plan Logistics and Supply Chain Mapping Dealing with suppliers and providers and development Finished goods delivery methods- MOCP, Pick to Light, Sort by light Identification of NVAA in processes, resource planning, manpower deployment, layout, ergonomics etc. Strategizing and defining the parts into Sequencing, JIS supply, JIT supply, Kitting Maintain and improve inventory accuracy between SAP (e-WMS) systems  Planning & Implementation of material flow method to the consumption end Golden Zone and Strike Zone Improvement in Work Place Responsible for Time Standards Estimation of workstations Member of LCS Pillar in World Class Manufacturing (WCM) Pillar and TPM (Total Productive Maintenance) execution Responsible for Material Flow Improvisation and Improvements Support to receiving & warehousing team in improvement project  Ownership in short term & long term projects in material handling, resource optimization Directing Logistics Examinations that Include Time Studies Execution of Layout Changes as per New Design Preparation of Monthly MIS Report and circulation to top management Milk-run Design, Process, Control and Optimization responsible Equipment designs as per the part fitment taking Quality issues and fitment issues in mind & Optimizations in the trolley EWMS location accuracy Prints development regarding material requirements Documentation of weekly development report and circulation within senior management Responsible for setting up the project; creation of mutual contacts between operations and IT department Import & Export Import planning as per production requirement and clear the cargo against MIES LIC /Advance LIC & EPCG LIC. Release new EPCG/Advance License with avail new MEIS License as per Export. Export Co-ordination as per PO and manage proper planning to deliver the cargo in time bond.   Co-ordination with CHA, Shipping Line, Forwarder and Transporter.  Vendor Debit INV Process Rebate/Refund claims. A regular visit to Customs / Excise / COCOR / Shipping LINE / CHA / Forwarder to maintain good relations. Maintain Export Records. International and Domestic courier corresponds with forwarder and party. New E-seal procedure. MOT Charges  Payment follows up with Overseas Customers. DBK query. Import activities correspond with Customs / CONCOR. BL Approval & Surrender. Maintain records of Import and Export. Mail correspondence & Co-ordination with Overseas Clients, CHA, SL, and Forwarder MEIS, Advance License, EPCG related working and follow up FIRC/MT103, BRC related work. MIS report to the head of department, ERP, Mail correspondence, Team guidance Job Location: Chitegaon MIDC, Aurangabad For more details call on 7249840222 / 9765567505 Send CV on career@paradiseplacement.co.in  
3 Opening(s)
4.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.20 LPA
Post: Production Supervisor  Education: DME / BE Mechanical Salary up to: 4.00 LPA Practically exposed to complete CNC machining operations (HMC/VMC  5 axis machine & Turning m/c , VTL m/c), CNC programming (FANUC, MAZAK, DMG Heidenhain, SEIMENS), Fixture setting, Component drawing study, fulfilling the production target through workload distribution. Daily work management (D.W.M.) and shift handling  Production planning and problem-solving  Rework, Rejection and line through back monitoring. Continuous improvement in the process to improve the quality point Gauges periodic status monitoring in monthly bases  Cost saving ideas for the improvement of the department.  Looking at the quality-related PM charts. Ensure 1S-2S on the shop floor. Knowledge about HMC, VMC as well as programme editing Daily KAIZEN, TPM for improving the process   Introduction of idea generation through CIT   Job ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile