1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 9.00 LPA
Planning & Implementation of PM, B/D activity of plant machines (monthly, quarterly, yearly).
Preparation of TBM/CBM plans for Critical/key equipments
To solve the breakdown problem of all Co2 welding, Robots (Fanuc &Panasonic make) machines, fine boring machines, SPM, Over head conveyors, Utility and other plant equipments.
Reviewing the requirement of critical and consumable maint. spares.
Reviewing of DWM in department.
Calibration of all types of pneumatic equipments.
To keep record of test certification of material handling equipments and compressor receivers.
Implementation of 5-S & TPM activities.
Proper utilization of man resource as per skill level.
Monthly maintenance CRM reporting to management.
Design and Development of machines to increase the productivity.
To manage maintenance expense within granted budget.
Maintaining documentation work related to ISO standard.
Monitoring & controlling on repair cost, energy saving & cost saving projects.
Job Location: Waluj Aurangabad
For More details call on 9765567699
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit.
Work as per the guideline of TPM/TS
Development and mfg. jig and fixture and establishment for production
Decided optimum cycle time for hydraulic and pneumatic testing
Co-Ordinate with PPC department for smooth production running
Set the robotic line as per the targets and balance the bottle neck operation
Overcome all the minor abnormality related to fixture during trial.
Set the TPM target for quality, maintenance, stores and production.
Arrange for all resources including raw materials, man power and facility required.
Handling overall press shop production for daily production targets
Overall responsibility of welding sub assembly of floor board and running board assembly
PROCESS follows with safety and through with safety and work permits.
Achieving the planned targets without Compromising the quality and quantity
Working as per various standards like ISO9001&Tsi6949-2002 system
Preparation of daily & Monthly reports
Co-Coordinating with Stores, QC, QA, Maint .In day to day activity
Awareness of seven QC tools to improve quality problems
Handling 4M for achieve desired production targets
Job Location : Waluj MIDC Aurangabad
For more details call on 9765567509
1 Opening(s)
4.5 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Daily production planning and target achieving as per plan.
Manpower handling solving customer complaint.
Daily model wise production planning.
Daily rejection analysis and root cause action report making and preparation of CAPA for any assembly defect.
Involve in implementation of kaizen at work station.
Familier with co2 ,spm and robotics welding, seam welding
Daily meeting taking ...
2 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.80 LPA TO 2.40 LPA
Daily production planning and target achieving as per plan.
Manpower handling solving customer complaint.
Daily model wise production planning.
Daily rejection analysis and root cause action report making and preparation of CAPA for any assembly defect.
Involve in implementation of kaizen at work station.
Familier with co2 ,spm and robotics welding, seam welding
Daily meeting taking ...
1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
Not Disclosed by Recruiter
Qualification: Diploma / BE in Mechanical or ProductionExperience: 10 to 18 years’ experience in Quality activities from Engg. Industry in design/ Engineering. Experience in Material handling equipment / conveyors will be added advantage. Important team member for working in Quality department.Age: 40 yrs or belowWork location: PCMC in PuneGender: Male
Job ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.00 LPA
- Diploma or BE in Electrical with 2 to 5 yrs experience in electrical maintenance of plant machines and welding equipments.- Exp in preventive and breakdown maintenance- Able to read electrical drawings and can do electrical maintenance.- Ready to work at Pirangut in Pue location- Bus facility is available.Salary: Rs ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
Degree/Diploma with 3-5 years hands on experience in light fabrication and assembly line. Job Profiles - 1) Knowledge of TPM/MS2) Knowledge of Assy line3) Knowledge of welding process4) Problem Solving5) Handle manpower effectively to achieve the production target
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
- Diploma, BE in Mechanical or Production with 4 to 10 yrs experience in light fabrication, Assembly for Automobile industry.- Experience in Laser cutting, bending and Welding process (TIG/MIG/ARC) for production of equipment like Canopi.- Deep Knowledge about press parts and their assembly work. Handle manpower effectively to achieve production targets.Salary: ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.50 LPA
Key Responsibilities: • Implement and monitor QA/QC procedures for PEB structures • Inspection of incoming raw material, in-process quality, and finished goods • Non-Destructive Testing (NDT) knowledge is a plus • Prepare quality documentation, welding logs, and inspection reports • Coordinate with client QC team and third-party inspections
Requirements: • Experience: ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
A Mechanical Maintenance Engineer is responsible for ensuring the optimal performance and reliability of mechanical systems and equipment within a facility or organization. This involves performing routine maintenance, troubleshooting issues, and implementing preventative measures to minimize downtime and optimize operational efficiency.
Key Responsibilities:
Preventive Maintenance:
Conducting regular inspections, scheduled maintenance, and preventative maintenance tasks to ...