1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 7.20 LPA
The Quality In-Charge in a steel plant oversees raw materials, in-process production, and finished goods (e.g., TMT bars, structural steel) to meet chemical, mechanical, and physical standards. They lead the testing laboratory, enforce compliance, and minimize product rejections.
Key Responsibilities
Quality Inspections: Test raw materials (scrap, sponge iron), monitor temperatures/chemistry in the ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
45.00 LPA TO 50.00 LPA
KEY RESPONSIBILITIES1. Integrated Program DeliveryOwns the integrated master schedule, critical path, dependencies, resource conflicts,long-lead items, test readiness, and recovery plans across engineering,manufacturing, procurement, assembly, and test. Drives daily execution with thefunctional team leads, re-plans against daily outcomes without losing the target, andholds the program accountable to schedule, cost, and technical ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
40.00 LPA TO 50.00 LPA
Key Responsibilities6.1. Safety Department Build-Out & Leadership• Establish org structure, reporting lines, KPIs, governance framework, and hiringroadmap• Set and own measurable leading indicators (near-miss reporting rate, PTWcompliance, training completion, drill frequency) reported to Directors monthly• Build a culture where every engineer and technician has the authority andconfidence to raise safety ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
JOB DESCRIPTION
07.07.26
139853
HPS/2026/574
Jr. QA Engineer
Male
1
1 to 3
DME/B.E Mech
8 Hrs
Min. 1-3 years of .experience in any Plastic/Rubber/Petrochemical manufacturing company
Job Responsibilities
• Inspect incoming raw materials, in-process production, and finished goods as per specifications.• Identify defects and deviations from approved standards.• Maintain inspection records, reports, and non-conformance logs.• Ensure production processes comply with company ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
3.60 LPA TO 4.80 LPA
JOB DESCRIPTION
07.07.26
139839
HPS/2026/570
Extrusion Shift Engineer
Male
1
4 to 6
B.Sc/Diploma-polymer/Plastics/DME/B.E Mech
8 Hrs
Min. 4-6 years of .experience in any Polymer manufacturing company
Job Responsibilities
• Operate and manage Extrusion machines and other related ancillary equipment during the shift hours.• To ensure production output meets daily and monthly scheduled with zero defects.• Set, monitor and adjust the ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.50 LPA TO 3.50 LPA
Position: Plant Operator
Location: Vapi
Experience: 1 - 3 Years
Industries: Chemical
Responsibilities:
Storing, retrieving, mixing, and monitoring chemical used in the production process.
Regulate flow of power, steam, water, air.
Add chemicals or products to converter.
Recording information, such as ingredients, weights, and temperature, and inputting into ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
5.00 LPA TO 6.00 LPA
Position: Production Engineer - IM
Location: Umbergaon nearby Vapi
Experience: 5 - 6 Years
Industries: Plastic
Responsibilities:-
Process Optimization: Establish and maintain correct machine parameters, such as speed, pressure, and cooling times, using Scientific Moulding principles.
Defect Troubleshooting: Identify and fix common plastic defects like short shots, warpage, flash, sink marks, ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
4.20 LPA TO 7.20 LPA
Lead and manage the complete procurement and purchasing function of the organization.
Develop sourcing strategies to ensure timely procurement of materials, products, and services at competitive prices.
Identify, evaluate, and develop reliable vendors and maintain long-term supplier relationships.
Negotiate pricing, payment terms, contracts, and delivery schedules with suppliers.
Prepare and process purchase requisitions, purchase ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
6.00 LPA TO 8.00 LPA
Job Title: Head – Electrical Maintenance
Company: Nath Industries Ltd.Location: Nath Paper Mill, PaithanQualification: B.E./B.Tech in Electrical Engineering (Preferred)Experience: 10–15+ YearsIndustry Preference: Pulp & Paper / Power Plant / Process Industry
Job Summary:The Head – Electrical Maintenance will be responsible for overseeing the overall electrical operations, maintenance, and reliability of plant electrical ...
1 Opening(s)
25.0 Year(s) To 35.0 Year(s)
24.00 LPA TO 36.00 LPA
Lead and manage all operations of the Steel Melting Shop (SMS) to achieve production, quality, and cost targets.
Plan and supervise steel melting operations, including furnace charging, melting, refining, alloying, and tapping.
Ensure efficient operation of Induction Furnace/Electric Arc Furnace, Ladle Furnace, and Continuous Casting Machine (CCM).
Monitor production schedules, furnace productivity, metal ...