1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.20 LPA TO 1.60 LPA
Urgent Requirement for Gardner (accommodation for family) for reputed company at shakti
Maintain and grow the garden to ensure it meets specific requirements and expectations.
Perform basic maintenance such as cutting the grass, emptying bins, managing weed control and leaf raking.
Plant and nurture new trees, flowers, and various plants.
Work with hand tools ...
4 Opening(s)
4.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 2.40 LPA
Urgent Requirement for Welder for Pipe division for reputed steel plant at raipur location.
Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Develops layout and plans sequence of operations for fabricating and assembling structural metal products,Applying trigonometry and knowledge of metal.Locates ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 2.50 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.60 LPA TO 2.00 LPA
Urgent Requirement for Electrical supervisor for foundry for reputed steel plant at raipur location
Process control, automation, electrical malfunction root cause & trouble shooting , corrective actions, schedule checks and calibration of process and , safety controls.
Urgent Requirement for Electrical supervisor for foundry for reputed steel plant at raipur location
Process control, ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.00 LPA
Job Description of 2nd class Boiler Operator:
Responsible for operation of Boiler,Biomass boiler DM/Power Plant .WHRB Boiler including de-aerator operations Steam turbines and steam networksResponsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over after maintenance Issuance of ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
1st class Boiler Operator:
Responsible for operation of Boiler,HRSG (Heat Recovery Steam generation)DM/ RO Plant Fuel handling system,Boiler feed water system including de-aerator operations Steam turbines and steam networks Responsible for safe shut down and start-up of boilers & boiler auxiliaries Handing over of equipment for maintenance & inspection and taking over ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 2.50 LPA
ITI Refrigeration (RAC)- 2 to 3 years experience in FMCG or Manufacturing ITI Fitter - 2 to 3 years experience in FMCG or Manufacturing Experience : ITI Fitter and ITI RAC candidates must have hands-on experience in operation and maintenance of Cooling systems like Cooling tower, Chilling Plant, Compressor, pump ...
1 Opening(s)
12.0 Year(s) To 13.0 Year(s)
10.00 LPA TO 12.00 LPA
Urgent requirement for manager turbine operation & maintenance
Turbine Maintenance2. BOP Maintenance3. Siemens Turbine experience preferable1. Turbine Maintenance2. BOP Maintenance3. Siemens Turbine experience preferable1. Turbine Maintenance2. BOP Maintenance3. Siemens Turbine experience preferable1. Turbine Maintenance2. BOP Maintenance
1. Turbine Maintenance2. BOP Maintenance3. Siemens Turbine experience preferable3. Siemens Turbine experience preferable
1 Opening(s)
8.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 8.00 LPA
Checking the material issuance and receipt of the products / goods.Interact with related ware houses and production department.Meetings and organizing plans to be conducted.Clearance & outstanding of materials from various transport to be tracked & dispatched accordingly.Stock verification & auditing to be done personally.Interact with internal team to ensure on time ...
3 Opening(s)
0 To 2.0 Year(s)
0.96 LPA TO 1.60 LPA
On Site Work on various locations where our projects is going cutting ,welding of MS pipe/GI pipe of 25 mm to 200 mm ,flange,bend etc
connect the pump & its accessories other relatred work
Hardworking,dedicated,Good Practical knowledge , Analyse Techincal drawings Report generation able to travel Develops layout and plans sequence of operations for fabricating and assembling ...