1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
7.00 LPA TO 12.00 LPA
JOB DESCRIPTION:
Job Responsibilities
To administer timely task completion, manpower allocation and scheduled running of mechanical, preventive, operational & break down maintenance. To ensure assigned tasks are timely completed and recorded whenever required.
Responsible for timely fault finding, repair & maintenance of both auxiliary as well as furnace operations in ferro plant.
Ensure that ...
2 Opening(s)
5.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 9.00 LPA
BOE CERTIFICATE
We are Currently Looking for Engineer/Manager(power plant) for Well reputed plant at Raigarh location.
Should be BOE CERTIFICATE
Operation and maintenance of boiler.Monitoring and control on DM plant parameter.Operation of turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all assistance ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
Job Description
Designation:
Site Engineers - Electrical
Job Location:
Kalpana Electricals,
Ahmedabad
Department:
Service - AMC
Grade/ Level:
Direct Reporting To:
Manager / Administration at Client Office
Direct Reportees:
Technician
New Position/ Back Fill:
Back Fill
No. of openings:
1
Job Purpose: The candidate shall be responsible for overall service to the customer. Also he will be responsible for coordination with client in initial process stages like ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.00 LPA
Operate conveyor belt to move objects.
Control speed and route of objects.
Take orders to have materials, products, or machinery moved.
Wait for incoming shipments and estimate delivery times.
Join sections of conveyor frames at temporary working areas, and connect power units.
Clean conveyor belt and remove debris.
Oil belts to ensure they move properly.
Move, assemble, ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
1.44 LPA TO 1.80 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
25.00 LPA TO 30.00 LPA
We Are Currently looking for Project Head for reputed Steel plant at ORISSA Location.
commissioning of following Projects
Working as Project Lead blast furnace,SINTER PLANT
F proper, cast house, Stoves,
Slag granulation plant, Gas cleaning plant, TRT, Coal injection plant, water & utility system, AC and
ventilation systems, Electrical & instrumentation works, CH FE system and ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.50 LPA TO 3.50 LPA
Important Keywords :
Rolling Mills , Tube Mills, Press Maintenance , EOT Cranes & PLC
Knowledge of PLC, AC/DC motors, Power Transformer , Circuit Breaker, HM-Serve Motor, DC Panel, APFC Panel, Rolling Mills , Tube Mills, Press Maintenance & EOT Cranes etc.
Candidates must have experience in Manufacturing units equipped with Rolling Mills ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
UI Development-
React and React Native (Redux state management)
JavaScript/HTML/CSS
Backend Development-
C# 7+ /.NET 4.8+ /.NET CORE 3+
Proper understanding of Unit Testing and Test Driven Development
Writing Unit Tests
Database-
SQL Server and T-SQL
Other tools-
Version Control-TFS & Git/GitHub
Google Firebase Cloud Messaging
Auxiliary languages-PHP/Java/Swift
Capacity to transition from small to large projects easily
Competence in cross platform development
Ability to communicate ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
4.80 LPA TO 6.00 LPA
Urgent Requirement for Assistant Manager Electrical SID for Reputed Steel plant at Bilaspur location.
In rotary kiln: - Maintenance of motor used for kiln main drive, auxiliary drive, shell air fans, coal injector, and thermocouple and transmitters.
Cooler section: - Maintenance of motor used for cooler drove.
Product separation building: - Maintenance of ...
2 Opening(s)
5.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 3.60 LPA
Monitoring the working of 12MW steam turbine.
Observing the all operating parameters of turbine Monitoring and observing the all parameters of lube oil system.Monitoring and observing steam flow to inlet and discharge of the turbine. Maintaining the condensed water level of hot well tank and CEP tank Preparation logbook sheet of turbine parameters and ...