1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.00 LPA
Description:
BOE certificate
Should be BOE CERTIFICATE
Operation and maintenance of boiler.Monitoring and control on DM plant parameter.Operation of turbine and auxiliary.Operation and maintenance of CHP and AHP.Costing of Power Generation.Planning for shut down and preventive maintenance.To provide all assistance for smooth operation.
have experience of Steam turbine & Boiler operations
Experience of maintenance & ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
18.00 LPA TO 24.00 LPA
Job Description:
General Manager (Power Plant) MECHANICAL - BROWN FIELD PROJECT
60 MW POWER PLANT , 250 TON AFBC BOILER
The general manager will be responsible for overseeing the efficient and effective operation of a power plant. Reporting to the Managing Director, the General Manager will lead a team of professionals and ensure compliance ...
1 Opening(s)
2.0 Year(s) To 15.0 Year(s)
2.40 LPA TO 15.00 LPA
Urgent Requirement for AGM/GM for power plant afbc cfbc boiler at Raipur location
To get maintenance data for Boiler’s & Turbine areas and evaluation of maintenance performance.
To continuously monitor/measure contract benchmarks, propose required corrective actions to sites.
To maintain centralized data like equipment details, monthly maintenance performance data etc.
To plan required External ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 16.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
10.00 LPA TO 12.00 LPA
Preventive, Predictive and Break down Maintenance of 1 x 80 MW CFBC & 2 x 45 MW AFBC Thermal Power Plant, AHS, CHP, DM plant, WHRB’S.
? Planning, Estimating and Indenting of spare and other consumable items for overhauling of equipment’s.
? Co-ordinates with operation, project, electrical, instrumentation, civil, store, purchase and personnel dept.
? Setting goals, objectives, and strategy to achieve zero breakdowns and zero accidents.
? Maintaining ISO, spare parts development, modification, replacement history documentation.
? Daily Job ...