1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.60 LPA
Job Description:
QA Engineer (01No)
About the responsibilities of the
Position: The main activity of the QA Engineer that he is responsible for all the Quality issues/Parts parameter checking (CMM).
Reporting to: QA Head UACPL
Educational Qualifications: Diploma in Engineering in the stream of Mechanical/ B.E (Mech.)
Desired Experience: Up to 3 to 4 years experience in ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 3.00 LPA
Position: Quality Engineer -CMM The main activity of the QA Engineer that he is responsible for all the Quality issues/Parts parameter checking (CMM).
Educational Qualifications: Diploma or Engineering in the stream of Mechanical
Desired Experience: Up to 3 to 4 years experience in a Manufacturing company preferably in an Automobile industry.
Skills Set required/Job ...
2 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 3.00 LPA
QA Engineer (01No)
About the responsibilities of the
Position: The main activity of the QA Engineer that he is responsible for all the Quality issues/Parts parameter checking (CMM).
Reporting to: QA Head UACPL
Educational Qualifications: Diploma in Engineering in the stream of Mechanical/ B.E (Mech.)
Desired Experience: Up to 2 to 4 years experience in a Manufacturing ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 2.60 LPA
QA Engineer (01No)
About the responsibilities of the
Position: The main activity of the QA Engineer that he is responsible for all the Quality issues/Parts parameter checking (CMM).
Reporting to: QA Head UACPL
Educational Qualifications: Diploma in Engineering in the stream of Mechanical/ B.E (Mech.)
Desired Experience: Up to 3 to 4 ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
9.00 LPA TO 10.00 LPA
Responsible and authorized for QMS, NPD, and gauge management quality.
1.Documentation control & record keeping for all parts related to new product development.
2.Process and product audits covering gauge design, development, and procurement.
3.Layered manufacturing system audit plan and follow-up system compliance.
4.Supplier process audits and performance monitoring monthly.
5.Active involvement in new part development ...