1 Opening(s)
10.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Seeking a Project Manager experienced in the construction of Cross-Country Pipelines.
The ideal candidate should have deep experience in Engineering, Procurement and Construction of pipelines.
Essential duties:
Project Management Professional, Oversee and direct Overall project from conception to completion.
He shall have experience in Execution of Project from Conceptual Design, Detail Design, Procurement, ...
2 Opening(s)
5.0 Year(s) To 8.0 Year(s)
16.00 LPA TO 22.00 LPA
The ideal candidate should have deep experience in Engineering, Procurement and Construction of pipelines. Essential duties:o He shall be fully familiar with and aware of international codes and Standards.o Responsible to Monitor day to day Project activities and assist Project Manager in achieving the target and Projectobjectives.o Responsible for ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Designation: AM / Manager CS legalExperience: CS or ICSI with 5 yrs experience Job Location: Mumbai, Nariman PointSalary Range: Best in industry Mobile Reimbursement , LTA , Annual Bonus, Pf , Gratuity
Working Days: 5 days a week (Mon to Fri) and (Sat and Sun fixed off)
Work Timings: 10:00 AM – 6:00 PM
Key Responsibilities
Corporate Governance
Ensure timely compliance ...
2 Opening(s)
12.0 Year(s) To 22.0 Year(s)
40.00 LPA TO 45.00 LPA
Position Title: Construction Manager
Location: Project Site (Site Specific)
Reporting To: Head- Projects
Role Overview
We are seeking a highly driven and experienced Construction Manager to lead the on-site execution and commissioning of large-scale renewable energy assets (solar, wind, hybrid) Site Specific. This role demands end-to-end ownership from detailed construction planning through to safe, ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
8.00 LPA TO 8.40 LPA
Job Responsibilities:
Lead and execute detailed engineering & design of Water Treatment Plants (WTP) and Wastewater Treatment Plants (WWTP)
Prepare P&IDs, GA drawings, equipment layouts, technical specifications, and BOMs
Perform process calculations, equipment sizing and selection for pumps, filters, clarifiers, aeration systems, etc.
Coordinate with process, mechanical, civil, electrical and instrumentation teams for integrated ...
1 Opening(s)
2.0 Year(s) To 9.0 Year(s)
0.00 LPA TO 7.00 LPA
We are looking for passionate and detail-oriented Architects and Interior Designers to join our team. The role involves creating innovative architectural and interior designs, managing projects from concept to completion, and ensuring compliance with industry standards. Junior Architects/Draughtsmen will assist in design development, drawings, and coordination, while senior professionals will ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
Requirements:
Proficient in AutoCAD (2D & 3D) for Electrical layout and design.Knowledge of electrical schematics, SLD (Single Line Diagrams), and panel layout drawings.Experience with cable routing, lighting & power layouts, grounding systems.Familiarity with BOM (Bill of Materials) and load calculations.Understanding of electrical codes and standards. (e.g., IS, IEC)Ability to read and ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Direct and manage the Project Construction from IFC to Handing over Project.
He shall have a minimum of 10 years of hands-on experience in construction of hydrocarbon facilities, Pipeline, Piping, Plant Process Equipment’s installation, structural, associated Civil, E & I and Pre-commissioning, Commissioning and Handover activities. In which he shall have ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
📢 Urgent Hiring: Estimation EngineerLocation: Indore express highway, Bhavda, AhmedabadExperience: 3 to 5 YearsEmployment Type: Full-time
Job Summary:We are seeking a skilled and detail-oriented Costing and Estimation Engineer with experience in electricaland control panels, LT (Low Tension), and HT (High Tension) systems. The ideal candidate will beresponsible for preparing accurate cost ...
4 Opening(s)
15.0 Year(s) To 25.0 Year(s)
45.00 LPA TO 52.00 LPA
Position
Construction Manager, experienced in the construction of Cross-Country Pipelines
Job Location
Saudi Arabia
Year of Experience
15 years
Education
Engineering
Roles & Responsibility
· Direct and manage the Project Construction from IFC to Handing over Project.
He shall have a minimum of 10 years of hands-on experience in construction of hydrocarbon facilities, Pipeline, Piping, Plant Process Equipment’s installation, structural, ...