1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 18.00 LPA
Deputy General Manager (DGM) for a Power Plant within a steel manufacturing unit is a senior leadership role focused on ensuring uninterrupted, cost-effective power supply to steel-making operations (e.g., Blast Furnaces, SMS, Rolling Mills). This role involves managing utility operations, maintenance, and compliance for captive power plants, often using Waste Heat Recovery ...
2 Opening(s)
15.0 Year(s) To 20.0 Year(s)
30.00 LPA TO 40.00 LPA
A)Job Purpose
To lead all the electrical, mechanical, instrumentation, BTE, Central and General Workshop planning activities for Acid plants and CPP in order to ensure seamless production and reduce unplanned downtime
B)Core Responsibilities
Ensure development of annual predictive and preventive maintenance plan for all the machines in plant and monitor the ...
1 Opening(s)
0 To 3.0 Year(s)
1.00 LPA TO 2.00 LPA
Job Location- Pimpri/ Bhosari Pune
JOB DESCRIPTION
Job Description :Experience in Unit testing and code coverage tools Automation test engineer
who has experience in developing test cases in vector Cast tool. Good experience in
Unit Testing which includes white box testing techniques (Coverage criteria, Different
type of test cases to improve code quality) Static analysis ...
3 Opening(s)
12.0 Year(s) To 15.0 Year(s)
0.00 LPA TO 30.00 LPA
Position: Corrosion Engineer
Location: Saudi Arabia
Experience requirement: Min. 12 years
Joining Date: Immediate to 30 days
Additional Qualification
? API-580 - Advance Risk Based Inspection Program
Certification No: 65497
? API-510 - Pressure Vessel Inspector Program
Certification No: 44554
? API-570 – Piping Inspector Program
Certification No: 41201
? API-571 – Damage Mechanism Affecting Fixed Equipment
Certification No: 70634
? Certified CSWIP 3.1 Welding Inspector, TWI ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipments Operation & Maintenence & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenence of electrical equipments like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
15.00 LPA TO 18.00 LPA
Responsible for all over Quality control and Quality Assurance department.
Reporting to MD, General administration also man power handling with safety rules & Rules & regulation & maintaining of QC logbooks and files as per ISO norms.
Work planning & distribution. Responsible for the Preventive maintenance & calibration
Laboratory instruments.
Responsible for Analysis and ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
6.00 LPA TO 8.00 LPA
CPP SR. MANAGER (MECH)
Qualification:- B.TECH
PURULIA, MADHUKUNDA locatiom
Exp. - Minimum 10 years in Power Plant
JOB DESCRIPTION OF CPP MECH SR. MANAGER Need to have 10 years’ experience in CPP. Should have exp. In working in Captive Power Plant of capacity 15-20 megawatt. Should have exp. In working in Captive Power Plant ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
8.00 LPA TO 10.00 LPA
Manage the operation and maintenance of Direct Reduced Iron (DRI) and Captive Power Plant (CPP) facilities.
Oversee the production of high-quality DRI and ensure seamless integration with steel production.
Monitor and optimize the efficiency of the power generation systems, including boilers, turbines, and electrical systems.
Implement preventive maintenance schedules to minimize downtime.
Ensure compliance ...
1 Opening(s)
15.0 Year(s) To 18.0 Year(s)
9.00 LPA TO 10.00 LPA
PURULIA, MADHUKUNDA location
. Overall ELEC. HOD :-
Qualification:- Diploma / B.Tech in ELEC.
Vacancies - 1
Exp. - 15 yrs. experience in DRI / CPP in any integrated steel plant.
JOB DESCRIPTION OF OVERALL ELECTRICAL HOD Candidates must be a qualified Diploma / B.Tech with 15 years of experience in DRI/CPP in anyintegrated steel plant ...