1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
18.00 LPA TO 18.00 LPA
Role Purpose
The Assistant Manager / Deputy Manager – EHS will be responsible for implementing and driving Environment, Health & Safety (EHS) systems across Operations & Maintenance (O&M) activities for hybrid renewable energy assets comprising Solar PV plants, Wind Farms, Pooling Substations (PSS), and associated HV/EHV transmission infrastructure. The role will ensure ...
1 Opening(s)
3.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Position: Assistant Manager – Solar Design
Division - Energy Solutions
Job Location: Mumbai
Experience required for the Job: 03-10 years
Required Skills:
Should have 03-10 years of relevant experience in similar profile.
Should have Bachelor’s degree in Electrical/Civil Engineering.
Should have experience in Primary and Secondary Engineering of EHV Substation Business.
Should have hand on experience on the ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
12.00 LPA TO 15.00 LPA
Position Overview:
We are seeking a highly competent Transmission Line (TL) & Bay Execution Assistant Manager to manage the end-to-end execution of transmission line and substation bay works for utility-scale Solar PV projects. The role demands a professional with strong expertise in transmission infrastructure, hands-on site execution experience, and proven ability ...
2 Opening(s)
2.0 Year(s) To 3.0 Year(s)
5.00 LPA TO 12.00 LPA
Job TitleEngineer/Assistant Manager – Clamps & ConnectorsQualificationB.E. / Diploma in Electrical or Mechanical Engineering
Experience• Minimum 2–3 years of experience in substation clamps and connectors• Hands-on experience in design, application, and selection of clamps & connectors up to 765 kV• For senior-level candidates, extensive experience in high-voltage clamps & connectors
Working knowledge ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.50 LPA
Ensure accurate and timely collection of Quality/Work progress.
Co -ordination from site to HO and implement experience on project site management methodologies while project execution.
Should be able to implement project schedule as per plan and strategy.
Able to take site level decisions for construction progress in compliance with quality cheques inspection before ...
1 Opening(s)
6.0 Year(s) To 7.0 Year(s)
3.60 LPA TO 4.20 LPA
A Senior Substation Engineer leads the design, technical execution, and commissioning of high-voltage (HV/EHV) substations, ensuring compliance with IEEE/IEC standards. Responsibilities include developing substation layouts, protection schemes, grounding, and relay settings, while mentoring junior staff and managing project budgets.
Key Responsibilities
Design & Engineering: Produce detailed engineering packages, including single-line diagrams, physical layouts, elevation, ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
A Deputy Manager/Manager for Substation (Operations or Projects) oversees EHV substation, transmission, or BESS projects, focusing on safety, design (SLD, layout), erection, testing, and commissioning. Key responsibilities include vendor management, technical drawing review (ETAP/AutoCAD), operational maintenance, and ensuring compliance with IEEE/IEC standards.
Key Job Responsibilities
Operations & Maintenance: Supervising daily operations, switching activities, and ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Contracts Management Civil Manager
Job Location:- Delhi,Mumbai
Experience:- 8-15 Yrs
Job Profile:
KRA: -
Contract Management and Administration
Reporting and Analytics
Stakeholder Management
Budgeting and Cost Management
Organisational Initiatives
Job Description: -
The incumbent would be responsible for the following:
1.Contract Administration and Management - Sourcing and selection of sub-contractors based on project requirements for EHV Substations. Conduct technical discussions with all ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Project Engineer
Job Location:- Agomoni, Assam
Function:- Project Execution
Experience:- 05-10 Years
KRA 1: Project Management:
Goal 1: Drive project progress & ensure timely completion of assigned projects both operationally & financially as per the planned timelines for EHV Transmission Lines upto 400 KV
Goal 2: Building strong relationship with key suppliers, external consultants, Sub contractors
Goal ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
22.00 LPA TO 28.00 LPA
Responsible for ensuring quality assurance and quality control of materials, equipment, and manufacturing processes related to Transmission Line and Substation projects. The role involves vendor quality surveillance, inspection coordination, Factory Acceptance Tests (FAT), compliance verification, and ensuring supplied equipment meets project specifications, applicable standards, and client requirements.
Key Responsibilities
Supplier Quality Management
Monitor ...